HYDRO-AIRE SERIES PRESSES
INSTALLATION, OPERATION, AND MAINTENANCE
8
3.3 Mounting Press
A. Select a bench of suitable size and strength.
B.
Bolt the press to the bench using the holes located
in the press frame below the platen area. Never
operate the press unless it is securely mounted on
a bench or stand. (Figure 1.3)
3.4 Connect Air Supply
A. The air supply must be clean and conditioned.
Preferably, a Filter, Regulator, Lubricator Unit,
(Joraco Part No. FRL-HP) should be located within
6 feet of the press. For optimum results all air lines,
fittings, and hoses used to supply the press should
be the equivalent of
1/2" minimum.
B. The minimum air pressure for operation is 50 PSI;
the maximum is 100 PSI. The optimum operating range
is 60-100 PSI. If your application consistently required
substantially more than 100 PSI it may indicate the
need for a stronger press.
C.
Connect air supply to the press at the inlet port.
NOTE:
If lower are pressure is required consult factory
about EZ-Dial option
NOTE:
A three way Shut Off Valve like the one supplied
must always be used to ensure complete bleeding
of the press circuits when air supply is off.
CAUTION:
WHENEVER CONNECTING YOUR AIR SUPPLY TO
THE PRESS BE CERTAIN TO FOLLOW SAFE OPERATING
PROCEDURES AND KEEP ALL PARTS OF YOUR BODY AWAY
FROM THE MOVING PARTS OF THE PRESS!
Inlet
(Figure 1.3)
(FRL Unit)
(Inlet)