7
Chapter 2 Hardware Setup
SB122A-PH User's Manual
Chapter 2� Hardware Setup
2�1 Central Processing Unit (CPU)
2.1.1 Removing the Central Processing Unit
Step 1
Remove the heatsink. The heatsink is attached to the server board or
processor socket with captive fasteners. Use a #2 Phillips* screwdriver to
loosen the screws x 4 located on the heatsink corners diagonally using the
following procedure (1a) to (1b).
(1a)
Use a #2 Phillips* screwdriver and start with screw 1 and loosen it by
giving it two rotations and stop (see letter A).
(1b)
Proceed to screw 2 and loosen it by giving it two rotations and stop (see
letter B). Similarly, loosen screws 3 and 4. Repeat steps A and B by giving
each screw two rotations each time until all the screws are loosened.
(1c)
Lift the heatsink upward (see letter C).
REM
OVE
REM
OVE
LGA20
11-3
** SU
PPLIER
IDENT
IFICAT
ION H
ERE **
INSTA
LL PRO
CESSO
R BEF
ORE
REMO
VING
COVE
R
SAVE A
ND RE
PLACE
COVE
R
IF PRO
CESSOR
IS RE
MOVE
D
Processor
Socket
2
3
1
4
A
B
C
IMPORTANT :
Do not fully loosen.
Содержание SB122A-PH
Страница 1: ...SB122A PH Storage Server Barebone User s Manual UM_SB122A PH_v 3_052918...
Страница 12: ...4 SB122A PH User s Manual Chapter 1 Product Features Front Panel...
Страница 55: ...Chapter 5 BMC Configuration Settings SB122A PH User s Manual 47 Step 3 Type in the subnet mask address...
Страница 67: ...Chapter 6 Hardware Specification SB122A PH User s Manual 6 2 Riser Card 6 2 1 Riser Card...
Страница 69: ...Chapter 6 Hardware Specification SB122A PH User s Manual 6 2 3 Internal Connectors Jumpers Power Connector J1...
Страница 70: ...Chapter 6 Hardware Specification SB122A PH User s Manual 6 3 Drive Slot Map...