Page 3 of 17
Scope of Delivery:
230 V dosing pump, stainless steel suction lance with foot filter and
2.5 m s 2.5 m return hose, 5 m pressure hose, electric
connection, nozzle kits, weld-on tubes (for fastening the nozzles on
the screw conveyor).
Standard 400 E (0.18 KW) 2 nozzle holders with nozzle kits
Standard 600 E (0.37 KW) 3 nozzle holders with nozzle kits
Standard 950 E (0.37 KW) 4 nozzle holders with nozzle kits
Quick Guide:
The following steps must be carried out prior to the first start-up of the
dosing device:
1. Screw together the suction lance. If required, seal the thread
nipple with sealing tape.
2. Unscrew the foot filter and fill the suction line with liquid. Replace
the foot filter. This is a one-time process required exclusively for
first commissioning.
3. Fully open the control valve (6) by turning it counter-clockwise.
4. Use the black button on the switch housing to switch on the pump.
5. Use the red (emergency stop) switch to switch off the pump. To
restart the pump, turn the red (emergency stop) switch clockwise.
Important!
The pump must not run dry for more than 1 minute.
After a short time, the floater in the flow indicator will start to float. The
scale shows the flow rate in l/h. In order to adjust the flow rate, turn the
control valve (clockwise = reduction; counter-clockwise = increase).
In order to check the flow rate, it is necessary to measure the pump
volume in litres. This is done by placing the nozzles into a bucket and
running the pump with the desired preservative. Leave the pump
running for one minute. Measure the quantity and compare it with the
pump setting, which may be readjusted if required.