Service
Maintenance Plan
Check – daily or every 12 hours of operation:
Verify that the displayed dew point is correct. Check the alarm log of the digital control
unit / LCD display.
Check – monthly or every 250 hours of operation:
Verify the cooling units/fins for cleanliness.
Check the proper operation of the condensate drain.
Check the function of the condensate pumps, especially the condition of the pump
hoses.
Check the filter (option) for contamination.
Maintenance – yearly or every 3000 hours of operation:
Verify for tightness all the screws of the electric system, inspect the cables. Replace the
fuse.
Clean the cooling units/fins. Visual inspection of heat-exchanger unit and insulation.
Replace the pump hoses, if necessary replace roller carriers and conveying belts, too.
Replace the filter cartridge (option).
Visual inspection for cleanliness and tightness of pre-separator, moisture sensor,
flowmeter (options).
After service work is done, reset service interval / operating hours counter
and acknowledge possible notifications of the alarm log
(see chapter
“Temperature-Monitoring and Error-Diagnosis”).