Installation-, Operating-, Maintenance-Manual, Spare Part List
BCR05
AGT-PSG GmbH & Co.KG
Errors and printing mistakes excepted
Page 9
Translation - Manual BCR05 Rev. 06/2017
Assembly and Installation
Feed Lines
All operations mentioned below to be performed by qualified personnel only.
As a standard, medium connections of the sample gas cooler have been designed for a 6/4mm hose. The
sample gas cooler is equipped with 1-2 heat exchangers (PVDF, glass or SS316) and provides 1-4
gaspaths. The following feed lines must be connected:
Sample gas pipelines to the gas inlet connections
Analyzers to the gas outlet connections
Condensate pumps/tanks to the condensate outlet connections
Marking
Gas inlet
Marking
Gas outlet
Gas inlet HE1 (red)
Gas outlet HE1 (blue)
Condensate outlet HE1
Gas inlet HE2 (red)
Gas outlet HE2 (blue)
Condensate outlet HE2
The feed lines of the numerous possible heat-exchanger types (material PVDF/glass/SS316,
construction mono/dual, condensate connection top/bottom – see chapter “Technical Data”)
may have different designs. Coolers without condensate pumps are equipped with heat-
exchangers with condensate outlet at bottom (pipe, 12mm outer diameter, without thread).
The picture above shows two SS316 mono-HEs with condensate connection at the bottom.