Mini Merlin Installation, Operation & Maintenance                                                                                                                              

 

Rev: 03 05-22 

5  

Installation 

Typical Application & Location 

 

Installation must be in accordance with the recognised standards of the appropriate authority in the country concerned! 

 

Access to the interior of the device, when carrying out any work, must only be conducted by trained personnel! 

 

Before carrying out any work ensure local regulations and site procedures are followed! 

 

Easy access is recommended for both status observation and alarm purposes and must be located out of reach of the public! 

 

Isolate the equipment from all hazardous live power sources before opening the cover! 

 

Avoid conditions of any other environmental factors outside of the specification that could potentially impede the accuracy 
and operation of the detector such as condensation; vibration; temperature, pressure, the presence of other gases, 
electromagnetic interference, and draft zones! 
 

Your new Mini Merlin is a dual gas detector carefully designed to monitor levels of Liquid Petroleum Gas (LPG) and 

Carbon Monoxide (CO) in the air. If there is a dangerous build-up of target gas at the sensor, this device can shut off 
the gas supply via a gas safety valve and /or gas fired appliance(s). This device has additional features for resetting 
systems, as well as audible and visual alarms and can also be integrated with a Building Management System (BMS). 

 
Your detector should be installed in areas at risk of gas leaks e.g., over boilers, valves, or meters. Located in positions 
determined by those who have knowledge of gas dispersion, the process plant system and equipment involved, and 
in consultation with both safety and electrical engineering personnel. 
 
Take in to account the design of the air flow patterns within the zone area. Detectors should be installed in the correct 
orientation, as recommended by the manufacturer, and ease of access should be accounted for to allow for any bump 
tests and other forms of maintenance throughout its operating life.  
 
There are no official figures of the area coverage of a gas detector; however, 50-100m

2

 per detector is a reasonable 

general guide therefore consider multiple detectors may be required to adequately protect property and persons.  
The target gas will only be identified when contact is made with the sensing element itself. 
 
Recommended heights may vary based on air flow and temperature conditions in addition to the proposed application 
and location. The device should be mounted near the boiler or gas fired appliances such as domestic & commercial 
boiler rooms and basements. 
 
As a guide only we recommend the following: 

 

6ft from sources of combustion e.g., boiler s/ heaters / gas fired appliances etc. 

 

4ft from draft zones and ventilation areas e.g., windows, doorways, and a/c units etc. 

 

5ft from ground level. 

 

There are no specific standards governing gas detector location (unlike fire detection systems); there are, however, 
general guidance documents. The most relevant being 

IEC 600-79-29-2: Explosive Atmospheres 

 Part 29: Gas 

detectors 

 Selection, installation, use and maintenance of detectors for flammable gases and oxygen

. Much of what it 

covers is also relevant to toxic gas detection. 

 
 
 
 
 
 
 
 
 
 
 
 

Содержание Mini Merlin LPGCO v2-FL

Страница 1: ...O v2 FL Dual Gas Detector Installation Operation Maintenance Manual Please read this manual carefully and retain for future use For specific requirements that may deviate from the information in this...

Страница 2: ...uits 8 Wiring Adaptable Outputs 8 Wiring Pilot Water Heater Boiler Limit Breaker 9 Wiring Remote Shut Off 9 Auto Reset Buzzer Switches 9 Building Management System 10 Operation 10 Initial Power Up 10...

Страница 3: ...ic medical conditions If in doubt consult a doctor physician Your product should reach you in perfect condition if you suspect it is damaged contact your supplier Warranty Statement Warranty Coverage...

Страница 4: ...used for heating cooking and vehicles It is Obtained during the processing of crude oil or direct from the sea Colourless and odourless An odourising agent is added before distribution Half as heavy a...

Страница 5: ...ted in positions determined by those who have knowledge of gas dispersion the process plant system and equipment involved and in consultation with both safety and electrical engineering personnel Take...

Страница 6: ...electrical box Restrain the hazardous live wiring from accidental loosening to prevent wires from moving after installation and touching parts of opposite polarity or at low voltages Isolate the equi...

Страница 7: ...than connected Heat detectors use wires suitable for at least 167 F 75 C Wiring Gas Solenoid Valve When the installation includes a standing pilot ensure the internal auto reset dip switch is in the O...

Страница 8: ...iance Multiple appliance limit switches can be wired in series Wiring Adaptable Outputs The mini merlin can be used to effect external relays and contactors to disable multiple appliances when a fault...

Страница 9: ...mally closed and will alarm when energised open isolating the gas supply When using this input only the mains utility output shall de energize If you are using the CO or NG relay to shut down a boiler...

Страница 10: ...he touch sensor on the front cover for 3 seconds The detector enters a stabilisation phase for approximately one minute during this period the device is not operational If the detector has been config...

Страница 11: ...h button is pressed and held during normal operation the mini merlin will simulate an open circuit to ensure all configured systems outputs alarms indications and other external devices operate as int...

Страница 12: ...briefly exposing the unit to a known concentration of the target gas that usually exceeds the highest alarm point If the detector goes into alarm and all signals outputs activate then the system is w...

Страница 13: ...ylinder All cylinders will re seal upon removal of the regulator valve Deviating from this test process is deemed improper and may affect the functional safety of your device Exposure to chemicals smo...

Страница 14: ...ne LPG LEL Batch Cylinder No CO ppm Batch Cylinder No Propane LPG LEL Batch Cylinder No CO ppm Batch Cylinder No Propane LPG LEL Batch Cylinder No CO ppm Batch Cylinder No Propane LPG LEL Batch Cylind...

Страница 15: ...3 15A 250Vac Equipment Overvoltage Category II Pollution Degree 2 Relays Volt Free BMS relay output 0 5A switching current resistive load Environmental Ingress Protection Not Formally Evaluated Opera...

Страница 16: ...nded and is free from any unforeseen damage caused by transit installation Every effort is made to ensure the accuracy of this document however AGS can assume no responsibility for any errors or omiss...

Отзывы: