background image

Agriframes, Journal house, Hartcliffe Way, Bristol, BS3 5RJ 

Orderline: 0117 934 1790 Fax: 0117 934 17 91 

Order on-line: www.agriframes.co.uk

 

 

*If the lattice option has been chosen you will need to follow the spacing guide for the 
lattice, to ensure that the lattice fits into the spaces.  

 

Slide 2 Spacer Bars with Ring Clamps onto each pair of uprights, tightening the grub screws 
once the Spacer Bars as positioned as illustrated in Figure 6. 

 

The lower Spacer Bars should be positioned 9 inches from ground level (once the 
uprights have been inserted) 

 

Position the Second Spacer Bar 40 inches above the lower Spacer Bar.  

 

Also check the positioning of the Spacer 
Bars on the Gazebo top, as shown in 
Figure 6. 

Step 7: 

 

Lift the constructed Gazebo top onto 
the uprights, then cover the joins with 
moisture seals.  

 

You will need at least 2 people 
for this step due to the weight of 
the Gazebo top.  

Step 8: 

 

Reposition the Stafford Curves 

 

Loosen the Parallel Clamp Joint, lower the Stafford Curves until the Parallel Clamp 
sits 2 inches below the join between the Upright and the full curve.  

 

Move the Parallel Clamp position of the Stafford Curve, until the Parallel Clamp holds 
the Stafford curve approximately 2 inches from the end of the curve.  

 

If you have any questions regarding assembly please call our customer service team on 0117 934 1790

 

Figure 6: Round Gazebo Spacer Bar Distances

 

Содержание 30546-TBK

Страница 1: ...uction Tips Before positioning the Spacer Bars on the uprights half screw in the grub screws to the Ring Clamps on the Spacer Bars to reduce the risk of losing the screws Once correctly positioned tighten the grub screw to secure the spacer bar to the uprights Positioning of the Spacer Bars In many cases the position of the horizontal bars is down to personal preference However if you have the lat...

Страница 2: ...s 41 from the other spacer bar Repeat this process until there are 4 sets of full curves created Step 2 Using 4 Parallel Clamps connect the Top circles together as shown in Figure 2 The easiest way to ensure that the full curves are connected evenly is to have one or 2 people align the curves to form the shape shown in figure 2 with the straight part of the curve resting on the floor Once the curv...

Страница 3: ...djust as necessary the clamps positioning on the Top Circles refer to Figure 1 and tighten the clamps Step 4 Move the Gazebo top to where the structure will be installed and firmly push the structure into the ground to make an impression or mark in the ground These impressions indicate where the uprights need to be inserted Step 5 Using the Hole Maker make holes 15 deep where you have marked the g...

Страница 4: ...s above the lower Spacer Bar Also check the positioning of the Spacer Bars on the Gazebo top as shown in Figure 6 Step 7 Lift the constructed Gazebo top onto the uprights then cover the joins with moisture seals You will need at least 2 people for this step due to the weight of the Gazebo top Step 8 Reposition the Stafford Curves Loosen the Parallel Clamp Joint lower the Stafford Curves until the ...

Отзывы: