background image

Agriframes, Journal house, Hartcliffe Way, Bristol, BS3 5RJ 

Orderline: 0117 934 1790 Fax: 0117 934 17 91 

Order on-line: www.agriframes.co.uk

 

Step 3: 

 

Tap an end plug 
into the ends of 
the Stafford 
curves, repeat 
this action with 
all 4 Stafford 
curves. 
 

 

TEMPORARILY attach, using Parallel Clamps, the Stafford Curves in the gaps between the 
Top Curves.  The Stafford Curve should be positioned in below the spacer bar on the Top 
Curve as illustrated in Figure 4.  

 

Please Note: once the top of the Gazebo has been placed onto the uprights the 
Parallel Clamps connecting the Stafford Curves will need to be lowered. The Stafford 
Curves will sit approximately 2” below the join of the 
Curves and Uprights. 

 

Ensure that once you have completed the construction of the 
Gazebo top, that you check the distance between the ends of 
the curves are equal. 

 

If the distances are not equal adjust, as necessary, the 
clamps’ positioning on the ½ Top Circles (refer to 
Figure 1), and tighten the clamps.  

Step 4: 

 

Move the Gazebo top to where the structure will be installed and firmly push the structure 
into the ground to make an impression or mark in the ground. These impressions indicate 
where the uprights need to be inserted.  

Step 5: 

 

Using the Hole Maker make holes 15” deep, where you have marked the ground previously. 
Ensure the holes are vertical and to the same depth.  

Step 6: 

 

Tap an end into the non-reduced end of the 8 upright poles, and insert these tubes (end 
plugs facing down) into the holes.  Slide a spacer bar onto the reduced end of the uprights 
and then partially tighten the grub screw.  

 

Slide a moisture seal over the reduced end of the upright. 

 

Connect the remaining uprights onto the inserted uprights, cover the join between the 2 
tubes with a moisture seal.  

Step 7: 

 

*If you have chosen not to include the lattice option you may place these Spacer Bars to 
suit.  

Figure 4: Positioning of the Stafford Curves

 

Figure 5: Aerial View of 
Completed Gazebo Top

 

Содержание 30546-TBK

Страница 1: ...uction Tips Before positioning the Spacer Bars on the uprights half screw in the grub screws to the Ring Clamps on the Spacer Bars to reduce the risk of losing the screws Once correctly positioned tighten the grub screw to secure the spacer bar to the uprights Positioning of the Spacer Bars In many cases the position of the horizontal bars is down to personal preference However if you have the lat...

Страница 2: ...s 41 from the other spacer bar Repeat this process until there are 4 sets of full curves created Step 2 Using 4 Parallel Clamps connect the Top circles together as shown in Figure 2 The easiest way to ensure that the full curves are connected evenly is to have one or 2 people align the curves to form the shape shown in figure 2 with the straight part of the curve resting on the floor Once the curv...

Страница 3: ...djust as necessary the clamps positioning on the Top Circles refer to Figure 1 and tighten the clamps Step 4 Move the Gazebo top to where the structure will be installed and firmly push the structure into the ground to make an impression or mark in the ground These impressions indicate where the uprights need to be inserted Step 5 Using the Hole Maker make holes 15 deep where you have marked the g...

Страница 4: ...s above the lower Spacer Bar Also check the positioning of the Spacer Bars on the Gazebo top as shown in Figure 6 Step 7 Lift the constructed Gazebo top onto the uprights then cover the joins with moisture seals You will need at least 2 people for this step due to the weight of the Gazebo top Step 8 Reposition the Stafford Curves Loosen the Parallel Clamp Joint lower the Stafford Curves until the ...

Отзывы: