Page 11
STEP 3:
Lift the beam / frame top assembly no less than 20 in. off the ground, move the Crate Bottom away, and then
assemble four Frame Legs. After the Frame Legs
installed and tightened, lower down the Splitter, and allow it standing firmly
on the ground. See FIGURE 6.
REF. NO.
DECSRIPTION
QTY.
4
Frame leg
4
5
Hardware Kit #12 (not shown)
1
Including:
5-1
Hex head bolt / M10 x 80
8
5-2
Spring washer / M10
8
5-3
Flat washer / M10
8
5-4
Nut / M10
8
(FIGURE 6)
Page 14
Содержание BE-LS22TL3PT
Страница 2: ......
Страница 6: ......
Страница 29: ...Page 22 EXPLODED DIAGRAM PARTS LIST Page 25...
Страница 32: ...Page 25 Page 28...
Страница 34: ...Page 27...
Страница 35: ...Page 28...
Страница 36: ...Page 29 Phone 1 877 588 3311 Fax 1 800 665 7334 WWW BRABEREQ COM...