29
AGORA
MODELS
S T E P 1
1
2
3
4
5
AT TA C H T H E F R O N T F E N D E R L I N E R S
Lower the Front Right Fender Liner onto the
Floor Panel as shown. Check the screw holes on
the Fender Liner also align with the screw holes
on the chassis frame (see picture 3). Fix in place
using 2 x TYPE OP08 screws and 1 x TYPE OD05
screw. Repeat on the left side to attach the Front
Left Fender Liner.
Stage 40: Front Fender Liners & Airflow Intake Panel
2 x OP08
1 x OD05
2 x OP08
1 x OD05
Содержание SHELBY COBRA 1965
Страница 6: ...6 AGORAMODELS SHELBY COBRA 427 S C Stage 32 complete Stage 32 Rear Right Lower Control Arm...
Страница 14: ...14 AGORAMODELS SHELBY COBRA 427 S C Stage 35 complete Stage 35 Outer Wheel Rim and Tire...
Страница 31: ...31 AGORAMODELS SHELBY COBRA 427 S C Stage 40 complete Stage 40 Front Fender Liners Airflow Intake Panel...