
AgiLight Inc. 1074 Arion Circle, Suite 116, San Antonio, TX 78216, United States of America, +1.866.482.0203
www.AgiLight.com
UL Installation Guide
© 2017 AgiLight Inc. 2017 All rights reserved.
Product Specifications subject to change without notice.
ING
-
00103 4
-
2017
Read Instructions Completely Before Installation. Altering The Product In Any Way Voids The Warranty.
Components:
1. AgiLight® Class II Power Supply
2. AgiLight® SignRayz® ULTRA MINI COLORS modules
3. Minimum 24 AWG (0.82mm) wire
-
(UL Listed)
*Under certain conditions, a heavier gauge wire may be necessary
4. PLTC Cable
-
(UL Listed)
5. Wire connectors, wire nuts, IDC, or butt splice connectors (UL Listed)
Tools:
1. Wire Strippers
2. Screw Driver
3. Taper Measurer
4. Drill w/
(1/4”
bit)
LED Module Installation
1.Clean inside of the sign with
denatured alcohol. Allow alcohol to
dry before proceeding.
2.Place LED modules in the sign
according to AgiLight® layout or
Population Density Guide. Cut
product accordingly
*Product may be cut in between modules
WARNING–
READ BEFORE WIRING
1. Must use General LED
’
s Class 2 power supply rated for 12 volts DC or less; proper wire gauge to connect to LED modules.
2. Check polarity for DC standard,
BLACK (
-
) to BLACK STRIPE (
-
)
and
RED ( + ) to WHITE ( + ).
3. UL 48 Standard requires a spacing between power supplies be at least 1 inch (25.4mm) from end to end, and 4 inches (101.6m m) from side to side.
4. Do not overload power supply and do not use products in submersed applications.
5. Ground and bonding of the LED power supply must be done in accordance with National Electric Code (NEC) Article 600.
6. Follow all National Electric Codes (NEC) and local codes.
Page 1 of 4
3.To adhere the LED module to the
sign
’
s back panel, remove liner from
tape and firmly press the module in
place. Repeat process for the rest
of the layout.
4.Drill a hole near the beginning
of the string of LED modules and
fit with an insulator for feeding
power supply wire to the
modules.
*Access hold should be approximately 1/4
inch (6.4mm) in diameter, minimum.
5.Remove debris and clean the inside
of channel.
Tc cannot
exceed 65°C