50
Agilent Intuvo 9000 GC Installation
1
Installing the GC
Traps are often the weakest part of the system. They should
be labeled, either on the trap itself or in accompanying
literature, with a maximum operating pressure. Source
pressure must not exceed the lowest maximum operating
pressure in the supply system.
suggests starting values of source pressure.
Table 6
Suggested starting pressures
Gas Use
Source
pressure
Carrier
Capillary columns
550 kPa (80 psi)
Air for FID, FPD
Detectors
550 kPa (80 psi)
Hydrogen
Detectors
410 kPa (60 psi)
Makeup gas
Detectors
410 kPa (60 psi)
TCD Reference
TCD
410 kPa (60 psi)
Air for valve actuators
Valves
345 kPa (50 psi)
Содержание Intuvo 9000
Страница 1: ...Agilent Technologies Agilent Intuvo 9000 Gas Chromatograph Installation and First Startup...
Страница 6: ...6 Agilent Intuvo 9000 GC Installation...
Страница 25: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 25 3 Reinstall the GC covers...
Страница 26: ...26 Agilent Intuvo 9000 GC Installation 1 Installing the GC Connect the power cord and LAN cable LAN...
Страница 27: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 27 Turn on the GC...
Страница 29: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 29...
Страница 52: ...52 Agilent Intuvo 9000 GC Installation 1 Installing the GC Detector cover Vent chimney Screw O Ring...
Страница 84: ...84 Agilent Intuvo 9000 GC Installation 1 Installing the GC 8 Close the GC front door...
Страница 114: ...Agilent Technologies...