3- 2
Testing Performance
This chapter explains how to verify correct oscilloscope operation and
perform tests to ensure that the oscilloscope meets the performance
specifications.
To completely test and troubleshoot the mixed-signal oscilloscope, you
will create and use a test connector accessory, as described in this
chapter.
• The test connector makes it easy for you to connect the oscilloscope
probes to function generators and measurement equipment with
minimum electrical distortion.
• The connector is used in the digital channel threshold accuracy test.
Let the Equipment Warm Up Before Testing
For accurate test results, let
the test equipment and the oscilloscope warm up 30 minutes before testing.
Verifying Test Results
During the tests, record the readings in the
Performance Test Record at the end of this chapter for your oscilloscope. To
verify whether a test passes, verify that the reading is within the limits in the
Performance Test Record.
If a performance test fails
If a performance test fails, first perform the User Cal procedure given in Chapter 4.
If the User Cal procedure does not correct the problem, refer to Chapter 4,
Calibrating
and Adjusting
.
service.book Page 2 Wednesday, August 28, 2002 3:25 PM
Содержание 54641A
Страница 4: ...iv service book Page iv Wednesday August 28 2002 3 25 PM ...
Страница 7: ...1 General Information ...
Страница 24: ...1 18 ...
Страница 25: ...2 Preparing the Oscilloscope for Use service book Page 1 Wednesday August 28 2002 3 25 PM ...
Страница 45: ...3 Testing Performance service book Page 1 Wednesday August 28 2002 3 25 PM ...
Страница 66: ...3 22 service book Page 22 Wednesday August 28 2002 3 25 PM ...
Страница 67: ...4 Calibrating and Adjusting service book Page 1 Wednesday August 28 2002 3 25 PM ...
Страница 76: ...4 10 service book Page 10 Wednesday August 28 2002 3 25 PM ...
Страница 77: ...5 Troubleshooting service book Page 1 Wednesday August 28 2002 3 25 PM ...
Страница 90: ...5 14 service book Page 14 Wednesday August 28 2002 3 25 PM ...
Страница 91: ...6 Replacing Assemblies service book Page 1 Wednesday August 28 2002 3 25 PM ...
Страница 107: ...7 Replaceable Parts service book Page 1 Wednesday August 28 2002 3 25 PM ...
Страница 114: ...7 8 service book Page 8 Wednesday August 28 2002 3 25 PM ...