40
100 Operator’s Manual
5
Troubleshooting and Maintenance
7
Reinstall and tighten the bulkhead fitting on the water bath.
8
Reinstall and tighten the elbow fitting to the bulkhead fitting.
9
Fill the water bath and turn on the heater / circulator.
10
Inspect the fitting for leaks. If the fitting still leaks, contact the
Dissolution Systems Service Department.
Visual Checks
1
Turn off power to the instrument and remove the power cord.
2
Remove the six screws located on the right side of the instrument and
remove the side cover.
3
Inspect the drive belt for unusual wear, fraying, and tension.
4
Check the spindle motor brushes for wear every three months.
5
Replace the side cover.
6
Replace the Phillips head screws.
7
Reconnect the power cord and turn on the instrument.
CAUTION
Panels or covers that are retained by fasteners which require the use
of a tool for removal may be opened only by Agilent-trained,
Agilent-qualified, or Agilent-authorized service engineers.
Содержание 100
Страница 1: ...Agilent Technologies 100 Automated Disintegration Apparatus Operator s Manual ...
Страница 5: ...Contents 100 Operator s Manual 5 Troubleshooting 49 Obtaining Warranty and Other Services 51 Index 53 ...
Страница 6: ...6 100 Operator s Manual Contents This page was intentionally left blank except for this message ...
Страница 8: ...8 100 Operator s Manual Figures This page was intentionally left blank except for this message ...
Страница 16: ...16 100 Operator s Manual 2 Introduction This page was intentionally left blank except for this messsage ...
Страница 54: ...54 100 Operator s Manual Index This page was intentionally left blank except for this message ...