Setting Up the 100
3
100 Operator’s Manual
21
Initial Power Up
Electrical Connections
See
, “100 Rear Panel,” to complete the steps that follow.
Figure 2
100 Rear Panel
1
Ensure the power is off.
2
Connect the power cord between the AC power connector and an AC
power receptacle of the appropriate voltage
.
3
Turn on the 100. The three position screens and the temperature
screen on the front panel illuminates immediately. You will hear the
circulator working as it begins to pump the bath water through the
system. Bubbles may appear at the water bath inlet as air is expelled
WARNING
Before plugging the 100 into any power outlet, ensure the
instrument is configured for the voltage provided. Check the
serial number tag on the rear panel to confirm the voltage
requirement.
The electrical connection at the back of the apparatus is the
primary disconnect for the instrument.
Содержание 100
Страница 1: ...Agilent Technologies 100 Automated Disintegration Apparatus Operator s Manual ...
Страница 5: ...Contents 100 Operator s Manual 5 Troubleshooting 49 Obtaining Warranty and Other Services 51 Index 53 ...
Страница 6: ...6 100 Operator s Manual Contents This page was intentionally left blank except for this message ...
Страница 8: ...8 100 Operator s Manual Figures This page was intentionally left blank except for this message ...
Страница 16: ...16 100 Operator s Manual 2 Introduction This page was intentionally left blank except for this messsage ...
Страница 54: ...54 100 Operator s Manual Index This page was intentionally left blank except for this message ...