Chapter 3: 10' Peak Handrail Kit Installation
10.Align the peak handrail posts (4) to the ends of the toe boards (5) and use it as a template to field
drill three holes in the toe board (5).
11.Install the peak handrail posts (4) to the ends of the toe boards (5) using 5/16" flange bolts (20) and
5/16" flange nuts (23).
NOTE:
The bolt (20) head must be installed towards the walking area.
12.Install the tube plugs (18 and 19) into the ends of the top and intermediate handrails (7 and 8).
Figure 3-11
Installing the handrail posts and tube plugs
34
PNEG-2041
6', 10' and 14' Peak Handrail Kits