Chapter 2: 6' Peak Handrail Kit Installation
23.Install the tube plugs (18 and 19) into the ends of the transition handrails (16 and 17).
24.Install the top and intermediate transition handrails (16 and 17) to the peak handrail post (4) and the
stair handrail post (13) using 1/4" self-drilling screws (21).
NOTE:
Field cutting of the transition handrails will be required to make them fit properly.
Figure 2-17
Installing the transition handrails
PNEG-2041
6', 10' and 14' Peak Handrail Kits
23