CHIMNEY

The stove is a radiant room heater and must be con-
nected to a chimney of the proper size and type. The
stove is supplied with a 5” flue spigot, where the
stove is installed in a smoke controlled area it is per-
missible to install the stove on a 5” (125mm) flue.
Where the stove is installed outside of a smoke con-
trolled area, it is possible that fuel other than smoke-
less may be used and the flue will require a 5 - 6”
increaser which must be fitted within 1 metre of the
flue outlet.

From the increaser to the chimney outlet it must be
completed in a minimum of 6” flue or equivalent
cross sectional area.  Do not connect to a chimney
serving another appliance.  A minimum chimney
height of 4.5m measured vertically from the flue out-
let of the stove is recommended to ensure sufficient
draught to clear the products of combustion.

A flue that has proved to be unsatisfactory, particu-
larly with regard to down draught should not be used
for venting this appliance until it has been examined
and any faults corrected.  

An existing masonry chimney should be inspected
and if necessary repaired by a competent mason or 
relined using an approved lining system. The stove
must be connected to a chimney with a minimum  

Fig.1

2300

600

Appliance

Soot Door

continuous draught of 12 Pascal’s. Poor draught
conditions will result in poor performance.  All regis-
ter plates, restrictor plates, damper etc., which could
obstruct the flue at a future date should be removed
before connecting this appliance.  If connecting to
an existing chimney with a flue diameter of more
than 150mm it is necessary to line the flue using a
suitable stainless steel flue liner.  Where a masonry
chimney is not available a proprietary type 125 –
150mm twin wall, fully insulated pipe may be used.
The pipe must terminate at a point not lower than the
main ridge of adjacent outside obstructions. With
such installation, access to the chimney must be
provided for cleaning purposes.  (See Fig.1)

When flue piping passes through a closure plate
with a sliding door,  ensure that the pipe continues
up and is ultimately connected to the flue liner and
well sealed with fire cement.`

Any existing chimney must be clear of obstruction
and have been swept clean immediately before
installation of the stove.  If the stove is fitted in place
of an open fire then the chimney should be swept
one month after installation to clear any soot falls
which may have occurred due to the difference in
combustion between the stove and the open fire.

Refer to BS EN 15287-1:2007, Design Installation
and Commissioning of Chimneys; Part 1: Chimneys
for non-room sealed heating appliances, for guid-
ance

TOP FLUE EXIT

For the top outlet configuration, remove the blanking
plate from the hob, remove the flue spigot from the
back plate and fix it to the hob. Fix the outlet blank-
ing plate to back plate (see Fig. 2). Push the flue out-
let connector pipe (not supplied) into the flue spigot
and cement into place using approved fire cement,
ensuring that no cement is blocking the flue pas-
sageway.

Fig.2

3

Содержание Little Wenlock Classic

Страница 1: ...t all times and should not be allowed to touch the hot working surfaces while in use or until the appliance has thoroughly cooled When using the stove in situations where children aged and or infirm p...

Страница 2: ...5 Extractor Fan 5 10 Commissioning Handover 5 11 Location 5 12 Clearance to Combustibles 5 13 Floor Protection 5 14 Stove Dimensions 6 15 Operating 6 16 Lighting The Fire 6 17 Recommended Fuels 7 Out...

Страница 3: ...eir website at www hetas co uk IMPORTANT WARNING This stove must not be installed into a chimney that serves any other heating appliance There must not be an extrac tor fan fitted in the same room as...

Страница 4: ...e flue at a future date should be removed before connecting this appliance If connecting to an existing chimney with a flue diameter of more than 150mm it is necessary to line the flue using a suitabl...

Страница 5: ...e manufacture of air vents should be such that the vent is dimensionally stable corrosion resistant and no provision for closure The effective free area of any vent should be ascer tained before insta...

Страница 6: ...use of the appliance with the fuels likely to be used on the stove and warn them to use only the recommended fuels for the stove Advise the user what to do should smoke or fumes be emitted from the s...

Страница 7: ...mechanism is used LIGHTING THE FIRE Use small pieces of dry kindling and light using a chemical firelighter or paper Add extra kin dling in small amounts and wait for the flame to establish before add...

Страница 8: ...od MSF Nominal Heat Output kW 4 7 4 7 Mean Flue Gas Temperature o C 317 282 Flue Gas Mass Flow g s 5 5 6 2 Typical Refuelling Interval h 1 1 Net Weight kg 69 Gross Weight kg 77 RE FUELLING When burnin...

Страница 9: ...s are disposed of by burial in soil or otherwise locally dispersed they should be retained in the closed container until all cinders have thoroughly cooled MAINTENANCE CREOSOTE Formation and Need for...

Страница 10: ...imney WARNING NOTE Properly installed operated and maintained this stove will not emit fumes into the dwelling Occasional fumes from de ashing and re fuelling may occur However persistent fume emissio...

Страница 11: ...g periods of slow burning of damp or unseasoned fuel as this will result in tarring flue ways and chimney i e timber 7 Allow adequate air ventilation to ensure plenty of air for combustion 8 Do not bu...

Страница 12: ...emptied 2 Open the spin valve by turning it anti clockwise Open secondary air control by pulling it fully out These parts will become hot Use the tool provided 3 Lay a few crumpled sheets of paper on...

Страница 13: ...shes have been cleaned from the ash com partment and that the air control is fully open to avoid condensation in the stove firebox and possible corrosion during this shutdown period CO ALARM Building...

Страница 14: ...PANEL 5 FLUE SPIGOT 23 FIRE FENCE 6 HOB 24 STAY ROD PROTECTION PLATE 7 OPERATING TOOL 25 TOP BAFFLE 8 FRONT 26 PULL KNOB 9 BASE 27 LONG TIE BOLT 10 ASHPAN 28 TIE ROD M8 X 260MM 11 RATING PLATE BRACKE...

Страница 15: ...14...

Страница 16: ...Aga Station Road Ketley Telford Shropshire TF1 5AQ UK N00471AXX Rev 004 DP 140313...

Отзывы: