Mounting pipes
1.
Dismount the nut and the compression fitting from the heating
circuit connection and place them onto the pipe.
2.
Connect the pipe and the heating circuit connection and tighten
the nut with a tightening torque of 100 Nm (±20 Nm).
3.
Tighten the nuts at the fasteners with a tightening torque of
5 Nm.