Mounting and commissioning
18
ProCalida® GT 3
5
Mounting and commissioning
Verify that ProCalida GT 3 is not subjected to direct sunlight at
the installation site.
Only mount clean components. Clean polluted components with
a moist piece of cloth. Make sure the sealing surfaces are clean.
Close unused connections with plugs or caps.
Connect pipes to the brine/heating circuit manifold in such a
way that there is no traction, pressure or mechanical tension
(see chapter 4, page 11).
Depending on the on site conditions, the distances between the
wall brackets could be shortened to 400 mm.
Comply with the maximum distances between the wall brackets
and between manifold ends and wall brackets (see chapter 4,
page 11).
5.1
Mounting the heating circuit connections
Grease the O ring.
Insert the heating circuit connection into the segment and lock it
with clamps.
Содержание ProCalida GT 3
Страница 14: ...Technical specifications 14 ProCalida GT 3 Fig 11 Pressure loss curves with flow meter 2 12 l min ...
Страница 15: ...Technical specifications ProCalida GT 3 15 Fig 12 Pressure loss curves with flow meter 5 42 l min ...
Страница 16: ...Technical specifications 16 ProCalida GT 3 Fig 13 Pressure loss curves with flow meter 35 70 l min ...
Страница 17: ...Technical specifications ProCalida GT 3 17 Fig 14 Pressure loss curves with flow meter 60 125 l min ...