2
CONTENTS
Page
INTRODUCTION ..................................................................................................... 3
1. SAFETY INSTRUCTIONS ................................................................................... 4
3.1. Requirements for Mounting the Primary converter ....................................... 5
3.1.2. Placing the PEA pair for single-beam sounding .................................... 5
3.1.3. Placing the PEA pair for two-beam sounding ........................................ 6
3.1.4. Placing the PEA for four-beam scanning ............................................... 6
3.3. Requirements for placing the Secondary measuring converter .................... 7
4.2. Mounting the Secondary Measuring Converter ............................................ 8
APPENDIX A. Relative length of straight pipe runs ........................................... 13
APPENDIX B. Report on mounting and start-up procedure .............................. 15
APPENDIX C. Kinematic viscosity ratio of water ............................................... 17
APPENDIX D. Straightening vane design ......................................................... 18