11
5. START-UP PROCEDURE
5.1. Before start-up you should check that flowmeter
’s operation parameters
specified in the Passport correspond to data entered in the flowmeter
memory.
5.2. Parameters of PEA are entered according to the Operation Manual,
Sections 2.1 Part II.
5.3. Processing of measurement results is adjusted according to the Opera-
tion Manual, Section 2.4, Part II.
5.4. External devices (analog recorder, modem, etc.) are connected to the
flowmeter, communication system and flowmeter outputs are adjusted
according to the instructions given in Part II of the Operation Manual.
5.5. Current date and time are checked and set if necessary (see Section
2.5, Part II of the Operation Manual).
5.6. The device should be switched into the OPERATION mode (a jumper
should be removed from terminal J4). Terminal J4 should be sealed. If
necessary, two fixing screws are sealed from the front panel side.
If the parameters are set correctly, the flowmeter displays flowrate
measurement results.
5.7. Requirements for mounting location and operating conditions specified
in this operational documentation are based on the most typical factors
affecting flowmeter performance.
The external factors that cannot be foreseen, evaluated or tested
by the manufacturer during designing may exist or appear on site.
In this case such factors should be eliminated or flowmeter should
be placed in other location.