
Maximum Safe Working Loads
The safe working load of the tower is
1250 kgs
including its own weight.
The maximum safe working load of any individual platform is
250 kgs
evenly distributed.
If the tower is to be used for any specific loading contact
your supplier or the manufacturer, Affix Scaffolding WLL.
Tel: +974 5529 9893 or Email: [email protected].
RECOMMENDATIONS :
Recommend a minimum of two people to assemble, dismantle and move the platform tower.
Check that all components are on site and in good working order.
Towers must always be climbed from the inside of the assembly using the ladder.
Lifting of components must be done inside the effective base area of the tower.
Damaged components or components from other tower systems must never be used.
Never build linked towers without correctly adopting the suggested stability solution.
Outdoor or Indoor towers must be secured to a building or fixed structure.
Linked towers must never be built as free-standing structures. Suitable tying-in must be used.
Do Not use boxes or steps to gain additional height.
Do Not lift or suspend an assembled mobile tower.
Beware of horizontal loads which can lead to instability of the tower. The Max. side force is 20kg.
Ensure that the assembly location is checked to prevent hazards during assembly or moving
and while working on the tower. Particular attention should be given to the ground condition,
whether level or sloping, obstructions and wind conditions. The ground condition must be
capable of supporting the tower structure.
03
USAGE ADVICE
Aluminium Linked Towers