
Moving the Tower
Comply To
Certified and independently tested for use.
Compliant to 3T Assembly process.
Safe working load on the platform is 250kgs/Sq Mtr, evenly distributed.
Maximum permissible distributed load on the tower 1250 Kgs.
Type Approval
Moving this tower is not possible since this is fixed-type structure. In case a movement is required,
the complete has tower has to be dismantled and re-erected at the required location.
24
The scaffold towers referred to herein have been tested by