
Step 16
Hook the lower set of 2 brdige decks (fixed
platforms) to the 2nd rung of the 2nd level
frames on either side
Step 15
Start erecting another tower at a distance
of
2.5 Mtrs
from the first tower. Ensure
the
Walkthrough Frames
of both the
towers face each other.
Repeat Steps 1 to 8 and prepare the other
tower upto the intermediate platform level.
13
ASSEMBLY