2. SAFETY INFORMATION
2.1. GENERAL SAFETY PRECAUTIONS
―
Carefully read the “Directions for use”, paying particular attention to the “Residual risks”.
―
Pay attention to the safety warnings.
―
Use the machine only for the use for which it is designed.
―
Sometimes, accidents can be caused by a "careless" use of the machine by the operator.
―
Pay maximum attention.
―
Preserve the readability of the information signs and observe the indications given.
―
Do not tamper with the safety devices and protections.
―
The personnel authorised to carry out any operation on the machine has to be adequately trained.
2.2. SAFETY WARNINGS FOR HANDLING AND INSTALLATION
―
The personnel authorised to handle the machine (loading and unloading) must possess particular
expertise in the field of intervention.
―
Carry out handling (loading and discharge) according to the information delivered together with the
product.
―
During handling use one or two assistants, if required. This operation may generate unpredictable risks.
―
In order to minimise the risks related to assistants' involvement, you must inform them priorily on the
type of work and the behaviour to be used.
―
The machine must be handled with the aid of specific means (crane, forklift etc.) by qualified personnel
capable of observing the safety requirements.
―
When using the lifting means, insert and/or fasten the devices (hooks, forks etc.) ONLY into the points
provided on the package and/or the machine.
―
Transport the machine suitable means of adequate capacity.
―
The minimum and maximum temperature (during transport and/or storage) must fall within the range
allowed in order to prevent damaging the electrical components.
―
Install the machine ONLY in spaces free of explosion and /or fire risks.
―
Avoid the spaces exposed to atmospheric and corrosive agents.
―
Assess, prior to installation, if it is necessary to draw up a "safety plan" in order to protect the safety of
the personnel involved.
―
Arrange beforehand the adequate safety conditions to operate in safety for working in areas at a height,
those that are not easily accessible or in any case, in dangerous areas.
―
Install the machine according to the minimum perimeter indicated by the manufacturer and the
surrounding activities.
―
Should the machine interface directly/indirectly with other machines or production lines, draw up the
installation design of the machine.
―
The design must include all the operating conditions in order to comply with the standards in force on
safety at work place.
―
Check that the installation space is properly ventilated in order to avoid air concentration unhealthy for
the operators.
―
Apply the most suitable solutions for reducing the noise levels and the acoustic pollution to minimum.
―
Carry out the electrical connections professionally and in full compliance with the instructions provided
by the manufacturer and the specific regulations in force.
―
The electrical connections must be carried out EXCLUSIVELY by operators with particular expertise in
the field of intervention.
―
The operator must test the machine and check, through a general test, that the machine can be
commissioned without any risk for the operator.
―
Dismantle all the packaging components in compliance with the standards in force in the country of
installation.
7/43