RailDriver’s
CabController
Aerosoft
GmbH 2013
10
Box Contents
As you unpack your RailDriver’ CabController control device, please check the
enclosed items against this packing list:
• RailDriver’s CabController Unit
• Installation CD
• Power supply (AC adapter)
• label sheets
• Operating Manual with stencil
Installing labels for the con-
trols and function keys
A.
Range
H.
Dyn Brake - Throttle
B.
E-Brake
I.
ENG - CS - SUP - REL
C.
Alert
J.
Auto Brake - Ind Brake
D.
Sand
K.
Full - Rel
E.
P (Pantograph)
L.
Wiper
F.
Bell
M.
Lights
G.
Forward- N - Reverse
Apply decals as indicated above.
NOTE:
G, H, I, and K are applied with the
left end of the label at the top of the control lever.
To remove wiper and light switch caps for labeling, insert a
thin bladed screwdriver into the slot on either side of the
switch and carefully pry up until the switch cap pops off.
To apply legends for the function keys, pry up
carefully, but with force, on the panel cover,
place the legend strips above the keys. When
placing the default layout strips, the
ESC
but-
ton will be the first button in the upper row,
and the
RailDriver Run/Stop
button will be
the first button in the lower row. Insert the top
of the panel cover first, and snap the bottom
back into place.
Note:
You can cut out the stencil for the function keys at the end of this manu-
al. In case of loosing you can find a file on the installation-CD to print it out by
yourself. It is in the file „Schablonen“.
Содержание Rail Driver's Cab Controller
Страница 19: ......