4.
SELECTION AND PLACE OF
INSTALLATION
Before beginning installation consent with
client and pay attention to the following
recommendations:
−
The support surface must be capable of
supporting the unit weight.
−
The safety differences between the
unit and other appliances or structures
must be scrupulously respected so that
the inlet and outlet air from the fans is
free to circulate.
−
The unit must be installed by an
enabled technician in compliance with
the national legislation in force in the
country of destination, respecting the
minimum technical spaces in order to
allow maintenance.
5.
POSITIONING
The machine is delivered from the factory
wrapped in estincoil.
Before handling the unit, verify the lifting
capacity of the machines used.
After removal of packaging, movement of
apparatus must be carried
out by qualified and adequately equipped
personnel. To handle the machine: see
figure
− attach the lifting belts to the relevant
eye-bolts (as indicated in figure).
ATTENTION
: ALWAYS USE THE RELEVANT
EYE-BOLTS
−
To ensure that the structure of the unit is
not damaged, place protection between
the lifting belt and the unit. It is strictly
prohibited to stand below the unit.
− Remember that whilst operational the
chiller can cause vibrations; therefore
anti-vibration mounts (AVX accessories)
are recommended, fixed in the holes
−
−
on the base according to the assembly
layout.
−
It is mandatory to foresee to the neces-
sary technical space in order to allow
ROUTINE AND EXTRAORDINARY MAINTE-
NANCE interventions
−
Fix the unit checking that it is level. Make
sure that the hydraulic and electric part
can be easily reached.
5.1. MINIMUM TECHNICAL (mm)
3000mm / 118.11in
HEIGHT
ATTENTION
:
ALWAYS USE
THE RELEVANT
EYE-BOLTS
800 mm
31 in
1100 mm
43 in
800 mm
31 in
800 mm
31 in
The unit must be installed by a qualified and suitably trained technician, in compliance with the
national legislation in force in the country of destination (Ministerial Decree 329/2004).
AERMEC will not assume any responsibility for damage due to failure to follow these instructions.
Before beginning any operation, READ THESE INSTRUCTIONS CAREFULLY AND CARRY OUT THE SA-
FETY CHECKS TO REDUCE ALL RISK OF DANGER TO A MINIMUM. All the staff involved must have
thorough knowledge of the operations and any dangers that may arise at the moment in which
the installation operations are carried out.