Function Tests

Test Outrigger Interlock

17 Twist to release the red Emergency Stop

button at the platform controls.

© Result: The up/down functions should

operate.

18 Unscrew one leveling jack until the

corresponding interlock display light turns off. ©

Result: The up function should not operate.

19Return the leveling jack to the previous

setting and check the bubble level.

20 Repeat this procedure for each outrigger.

Test Manual Lowering

Do Not Operate Unless:

You learn and practice the principles of safe
machine operation contained in this operator’s
manual.
1 Avoid hazardous situations.
2 Always perform a pre-operation inspection.

3 Always perform function tests prior to use.
4 Inspect the workplace.

Know and understand the work place

21 Raise the platform slightly.

22 Activate the manual lowering valve
located at the side of the hydraulic unit.

Result: The platform should lower.

inspection before going on
to the next section.

5 Only use the machine as it was intended.

Fundamentals

The workplace inspection helps the
operator determine if the workplace is
suitable for safe machine operation. It
should be performed by the operator prior
to moving the machine to the workplace.
It is the operator’s responsibility to read and
remember the workplace hazards, then
watch for and avoid them while moving,
setting up and operating the machine.

Содержание GTWY Series

Страница 1: ...AERIAL WORK PLATFORM OPERATOR S MANUAL with Maintenance Information GTWY Series Original Instructions...

Страница 2: ...d be considered a permanent part of your machine and should remain with the machine at all times Contents Page Safety Rules 1 Controls 5 Illustration 6 Pre operation Inspection 7 Maintenance 9 Functio...

Страница 3: ...ructions and safety rules safety and operator s manuals and machine decals You read understand and obey employer s safety rules and worksite regulations You read understand and obey all applicable gov...

Страница 4: ...o the machine by raising or lowering a fixed or overhanging load Do not push off or pull toward any object outside the platform Maximum allowable side force 200N Do not operate the machine near drop o...

Страница 5: ...er the platform entry mid rail before operating Collision Hazards Operators must comply with employer job site and governmental rules regarding the use of personal protective equipment Check the work...

Страница 6: ...Conduct a thorough pre operation inspection of the machine and test all functions before each work shift Immediately tag and remove from service a damaged or malfunctioning machine Do not use the mac...

Страница 7: ...5 Ground Controls Power Switch Emergency Stop button Up down button Fuse Power light Outrigger interlock Light Platform Controls Emergency Stop button Control activate button Up down button AC power p...

Страница 8: ...r socket 3 Outrigger with leveling jack Platform Platform entry mid rail Ground controls Circuit breaker Mast Lifting eye Microswitch handle Outriggers storage bracket 13 manual lowering valve retaini...

Страница 9: ...rmed by the operator Refer to the list following and check each of the items If damage or any unauthorized variation from factory delivered condition is discovered the machine must be tagged and remov...

Страница 10: ...sed in this manual to help communicate the intent of the instructions When one or more of the symbols appear at the beginning of a maintenance procedure it conveys the meaning below Indicates that too...

Страница 11: ...s that have been out of service for more than three months must receive the quarterly inspection before they are put back into service Do Not Operate Unless You learn and practice the principles of sa...

Страница 12: ...t the corresponding light is on 8 Repeat this procedure for each of the remaining outriggers 9 Use the bubble level and adjust the leveling jacks until the machine base is level 10 Push in the up down...

Страница 13: ...nual 1 Avoid hazardous situations 2 Always perform a pre operation inspection 3 Always perform function tests prior to use 4 Inspect the workplace Know and understand the work place 21 Raise the platf...

Страница 14: ...rkplace 5 There must be at least 1 safety supervisor next to the machine when it works to supervise the operation and make sure no hazard to the machine and operator 6 Only use the machine as it was i...

Страница 15: ...all four interlock display lights at the ground controls are on and all four outriggers are in firm contact with the ground 8 Use the bubble level to make sure the machine is level Note If adjustment...

Страница 16: ...the platform controls and the ground controls 2 Remove the key to secure from unauthorized use Turn off the circuit breaker and the power light is out Cut out the power and fixed the cable 4 Select a...

Страница 17: ...and loading surfaces are sufficient to support the machine weight See the serial label for the machine weight Some pick up truck tailgates are not strong enough to support the weight of the machine a...

Страница 18: ...ck position a stop bracket b loading pivot All models without tilt back frame a stop bracket b loading pivot All models with tilt back frame 1 Hook the loading pivot to the stop bracket 2 Position the...

Страница 19: ...m in the storage sockets 4 Inspect the entire machine for loose or unsecured items 5 Connect the cable to the winching point located at the rear of the base 6 Carefully winch the machine onto the truc...

Страница 20: ...t tilt the machine back unless the area is clear of personnel and obstructions Do not stand behind or under the tilt back frame when raising or lowering it Tilt back Frame The GTWY Series has a tilt b...

Страница 21: ...behind the machine and under the tilt back frame is clear of personnel and obstructions 2 Fully lower the platform 3 Remove the outriggers from the base and place them in the storage sockets The tilt...

Страница 22: ...e retaining pin Returning the Machine to Standing Position 1 Be sure the area below the machine base and T handle is clear of personnel and obstructions 2 Slide out the T handle until the lock pin sna...

Страница 23: ...Label Lifting eye 1 GTWY4 12 Label Upper control box 1 9213051 Label Machine information 1 9422015 Notion Pre operating Instruction 1 GTWY4 16 Notion Outrigger Adjustment 4 Item Part No Description Q...

Страница 24: ...Operator s Manual GTWY SERIES 22 Decals...

Страница 25: ...Operator s Manual GTWY SERIES 23 Hydraulic Schematic...

Страница 26: ...Operator s Manual GTWY SERIES 24 Electric Schematic...

Страница 27: ...ge 1700mm 1700mm 1700mm 1700mm 1700mm 1700mm 1900mm 1700mm 2300mm 2100mm Voltage 220V 110V 220V 110V 220V 110V 220V 110V 220V 110V Phase Single Single Single Single Single Hertz 50HZ 60HZ 50HZ 60HZ 50...

Отзывы: