20/36
Aereco S.A.
START-UP
Before starting, check the mounting of the fans on their chimney and the non-obstruction of the
duct (any object inside would cause a stress on the turbine)
Do not insert anything through them
Never turn on the fans if the electronic driving box is open
All the following operations must only be carried out once the electrical box is completely finished
(all the electrical connections must be completed)
Setting
Before starting, it is necessary to identify each fan group and to set each fan (that is to say, define its
operating speeds).
As a reminder, usually a fan group corresponds to a stack of dwellings.
1)
Identify each fan that you want to group together
and note the
group number in the insert "Gr" on each corresponding Fan module.
Important: a maximum of 5 groups are possible having each a
maximum of 5 fans.
Содержание VBP+
Страница 11: ...11 36 Aereco S A ...
Страница 13: ...13 36 Aereco S A Temperature sensor connection only ...
Страница 14: ...14 36 Aereco S A Wind gauge connection only ...
Страница 15: ...15 36 Aereco S A Clock connection only ...
Страница 16: ...16 36 Aereco S A Temperature sensor wind gauge connection ...
Страница 17: ...17 36 Aereco S A Temperature sensor clock connection ...
Страница 35: ...35 36 Aereco S A ...
Страница 36: ...36 36 Aereco S A Manufacturer Aereco S A 62 avenue de Lamirault Collégien 77615 MARNE LA VALLEE CEDEX 3 FRANCE ...