SAFETY PRECAUTIONS
1-2
1.2 EMERGENCY SHUTDOWN
Should overheating occur or the gas supply
fail to shut off, manually shut off the gas
supply external to the boiler.
1.3 PROLONGED SHUTDOWN
After prolonged shutdown, it is
recommended that the startup procedures in
Section 4 and test procedures in Section 6
of this manual be performed, to verify
system-operating parameters. If there is an
emergency, turn off the electrical power
supply to the Aerco boiler and close the
manual gas valve located before the unit.
The installer is to identify the emergency
shut-off device
Содержание Benchmark G-00-711
Страница 62: ...APPENDIX C ix Temperature Sensor Resistance Chart Balco ...
Страница 69: ...APPENDIX F xvi ...
Страница 70: ...APPENDIX F xvii ...
Страница 71: ...APPENDIX F xviii ...
Страница 72: ...APPENDIX F xix ...
Страница 73: ...APPENDIX F xx ...
Страница 74: ...APPENDIX G xviii ...
Страница 75: ...APPENDIX G xix ...
Страница 76: ...APPENDIX H xxi ...