It is important to perform the following procedure as outlined. This will keep readjustments to a
minimum and provide optimum performance.
Natural Gas Combustion Calibration
1. Open the water supply and return valves to the unit and ensure that the system pumps
are running.
2. Open the natural gas supply valve to the unit and then slowly open the Pilot gas valve.
3. Set the control panel
ON/OFF
switch to the
OFF
position
4. Turn on external ac power to the unit. The display will show loss of power and the time and
date.
5. Set the unit to the manual mode by pressing the
AUTO/MAN
key. A flashing
manual valve
position
message will be displayed with the present position in %
.
Also, the
MANUAL
LED
will light.
6. Adjust the air/fuel valve position to 0% by pressing the
▼ arrow key.
7. Ensure that the leak detection ball valve downstream of the SSOV is open and the
manometer is attached and functioning properly.
8. Set
the
ON/OFF
switch
to
the
ON
position
.
9. Change the valve position to 50
% using the ▲ arrow key. The unit should begin its start
sequence and fire.
10. Next, verify that the gas pressure downstream of the SSOV is set to
7.5” to 8.3” W.C.
If
gas pressure adjustment is required, remove the brass hex nut on the SSOV actuator to
access the gas pressure adjustment screw (Figure 4-3). Make gas pressure adjustments
using a flat-tip screwdriver to obtain a gas pressure between
7.5” and 8.3” W.C.
Figure 4-3: Gas Pressure Adjustment Screw Location
BRASS HEX HEAD
(Remove to access
the Gas Pressure
Adjustment Screw).