MAINTENANCE
7-2
5. Next, loosen and remove the ignitor-injector
from the burner housing using a 1" open-end
wrench.
6. Check the ignitor-injector for evidence of
erosion or carbon build-up. If there is
evidence of substantial erosion or carbon
build-up,
the
ignitor-injector should
be
replaced. If carbon build-up is present, clean
the component using fine emery cloth.
IGNITOR-
INJECTOR
120
BURNER
HOUSING
HOUSING
CENTERLINE
Repeated carbon build-up is an indication
that the combustion settings of the unit
should be checked. Refer to Chapter 4 for
combustion calibration procedures.
7. Prior to reinstalling the ignitor-injector, a high
temperature, conductive, anti-seize com-
pound must be applied to the threads.
NOTE
If a replacement ignitor-injector (part no.
58023) is being installed, a compression
nut containing a built-in ferrule will be
included with the replacement part. If
needed, 3 indexing washers are also
included. These washers may be needed
to properly position the gas injector tube
of the ignitor-injector within the 120° angle
shown in Figure 7-2.
DEG.
GAS INJECTOR TUBE
MUST BE WITHIN
THIS RANGE
Figure 7-2
Burner Assembly – Top View
8. Reinstall the ignitor-injector in the burner
housing and
torque to 80 to 90 in-lbs.
However, if the burner housing was replaced
just prior to replacing the ignitor-injector,
torque to 180 in-lbs
, then loosen and re-
tighten to 80 to 90 in-lbs
.
9. Connect the staged ignition assembly to the
gas injector tube of the ignitor-injector by
securing the compression nut to the elbow of
the staged ignition assembly.
10.Reconnect the ignitor-injector cable.
11.Reinstall the side and top panels on the unit.
Table 7-1 - Maintenance Schedule
PARAGRAPH
ITEM
6 Mos.
12 Mos.
24 Mos.
Labor
Time
7.2
Ignitor-Injector
(58023)
*Inspect
Inspect
Replace
15 mins.
7.3
Flame Detector
(66034)
*Inspect
Inspect
Replace
15 mins.
7.4
Combustion
Calibration
*Check
Check
1 hr.
7.5
Testing of
Safety Devices
See CSD-1
Chart in
Appendix I
20 mins.
7.6
Burner
Inspect
2 hrs.
7.7
Condensate
Drain Traps
*Inspect
Inspect &
Clean
1 hr.
* Only performed after initial 6 month period after initial startup.
Содержание Benchmark 3.0LN Series
Страница 6: ...iv ...
Страница 8: ...B ...
Страница 42: ...INITIAL START UP 4 8 ...
Страница 80: ...A 6 ...
Страница 84: ...B 4 ...
Страница 86: ...C 2 APPENDIX C ...
Страница 93: ...APPENDIX F APPENDIX F F 1 ...
Страница 94: ...APPENDIX F F 2 ...
Страница 95: ...APPENDIX F F 3 ...
Страница 96: ...APPENDIX F F 4 ...
Страница 97: ...APPENDIX F F 5 ...
Страница 98: ...APPENDIX F F 6 ...
Страница 99: ...APPENDIX F F 7 66034 ...
Страница 100: ...APPENDIX F F 8 ...
Страница 101: ...APPENDIX F F 9 ...
Страница 102: ...APPENDIX F F 10 ...
Страница 103: ...APPENDIX F F 11 ...
Страница 104: ...APPENDIX F F 12 ...
Страница 105: ...APPENDIX F F 13 ...
Страница 106: ...APPENDIX F F 14 ...
Страница 107: ...APPENDIX G APPENDIX G G 1 ...
Страница 108: ...APPENDIX G G 2 ...
Страница 109: ...APPENDIX G G 3 ...
Страница 110: ...APPENDIX G G 4 ...
Страница 111: ...APPENDIX G G 5 ...
Страница 112: ...APPENDIX G G 6 ...
Страница 113: ...APPENDIX H APPENDIX H H 1 ...
Страница 114: ...APPENDIX H H2 ...
Страница 115: ...APPENDIX H H 3 ...
Страница 116: ...APPENDIX H H 4 ...
Страница 117: ...APPENDIX H H 5 ...
Страница 118: ...APPENDIX H H 6 ...
Страница 119: ...APPENDIX H H 7 ...
Страница 120: ...APPENDIX H H 8 ...
Страница 122: ...APPENDIX I I 2 ...
Страница 126: ...NOTES ...