. OPERATION AND USAGE
UPS On
UPS Off
Confirm: yes
no
.1 INITIAL INSTALLATION
.1.1 SWITCHING ON UPS
Insert the plug of the power cord into the correctly fused power outlet of your
sub-distribution system. The UPS will be immediately supplied with power from the
public power network. It will start up with an initialization phase, indicated by the AEG
logo, which appears on the screen for 5 seconds. After that, you will see the following
message:
Now confirm the highlighted UPS On command by pressing ENTEr . old the key
pressed for approx. 1 second. The UPS will synchronize and switch into normal
operating mode after just a few seconds. The display will switch to the UPS status
display.
If there are no keys pressed for 5 minutes, the display will automatically switch back to
the UPS status display. Press
▲
to return.
.1.2 SWITCHING OFF UPS
If the UPS is in operation, it is possible to access the command above by pressing
▲
when in the basic UPS status screen. Once you have confirmed the command
again, the UPS will switch o or switch to bypass depending on the setting selected .
To enable you to find the UPS On or UPS O menu item more easily, the following
symbol appears above the
▲
key.
Содержание PROTECT C Series
Страница 1: ...PrOTECT C User Manual Protect C 1000 Protect C 2000 Protect C 3000 EN DE ...
Страница 2: ......
Страница 19: ... 2 RÜCKSEITIGE ANSICHT ANSCHLÜSSE Protect C 1000 Protect C 2000 Protect C 3000 DE 1 ...
Страница 57: ...NOTIZEN DE ...
Страница 58: ...NOTIZEN ...
Страница 59: ...NOTIZEN DE ...
Страница 60: ... ...
Страница 77: ... 2 REAR VIEW CONNECTIONS Protect C 1000 Protect C 2000 Protect C 3000 EN 7 ...
Страница 115: ...NOTES EN ...
Страница 116: ...NOTES ...
Страница 117: ...NOTES EN ...
Страница 118: ...NOTES ...