AEG AS-M 2 Series Скачать руководство пользователя страница 7

7

AEG STANDARD MODULE INSTALLATION MANUAL

GD202104 V1-21

EN

Ensure to avoid shadowing from module clamps. Please 
refer to figure 4 and figure 6, and paragraph 3.2.4 
„Loading capacity“ for details on the individual product 
series. 

Figure 4: Clamping

3.2.3 Insertion systems

AEG solar modules are compatible with the insertion 
systems of selected manufacturers. For more 
information, and for a compatibility assessment of the 
insertion system you wish to use, contact the AEG 
service team (see Section 6 „Contact“).

3.2.4 Loading capacity

The PV module‘s load resistance is rated as:    
Wind load: 2400 Pa / Snow load:  5400 Pa.  
Please note this could vary according to the different 
mounting systems and configurations.

For standard conditions, low loading capacity applies: 
AEG modules are tested under a maximum positive 
pressure of 2400 Pa, and negative pressure of 2400 Pa. 

For extreme conditions (e.g.: heavy snow), high loading 
capacity applies: AEG modules are tested under a 
maximum positive pressure of 5400 Pa, and negative 
pressure of 2400 Pa.

Please note the indications in the below pictures:

L=module length (module long side)   

W=module width (module short side)  

X, Y=clamp installation point/ 

(arrows) bolting/clamping points

Mounting with bolts

Module series:  

AS-Mxxx2,  

AS-Mxxx9, AS-Pxxx9  

Module series: AS-Mxxx2,  

AS-Mxxx8, AS-Pxxx8,  

AS-Mxxx9, AS-Pxxx9

Load: 

positive 2400Pa 

negative 2400 Pa

Load 

positive 5400 Pa

negative 2400 Pa

Module series:  

AS-M1203 (G1),  AS-M1203 (M6), 

AS-M3607-S (G1)

Module series:  

AS-M1443 (G1),  

AS-M1443 (M6)

Load: 

positive 5400Pa 

negative 2400 Pa

Load 

positive 5400 Pa

negative 2400 Pa

Module series:  

AS-M1443 (G1),  

AS-M1443 (M6)

Module series:  

AS-M4327-S(G1) 

AS-M4327-S(G1)* 

Load: 

positive 2400Pa 

negative 2400 Pa

Load: 

positive 5400Pa 

negative 2400 Pa 

*

=add in case of extreme environmental conditions 

Module series:  

AS-M1443 (G1)

Module series:  

AS-M1443 (M6)

(Pitch bolt) Load: 

positive 2400Pa 

negative 2400 Pa

(Pitch bolt) Load: 

positive 2400Pa 

negative 1700 Pa

400 mm

400 mm

Figure 5: Bolting, loading capacity scheme

PV module

Frame

Mounting 

 rails

Clamp B

Flat washer

Spring washer

Nut

Flat washer

Bolt

PV module

Mounting structure

Bolt

Flat washer

Clamp

Nut

Spring washer

*

*

*

*

Содержание AS-M 2 Series

Страница 1: ...EG STANDARD MODULE INSTALLATION MANUAL GD202104 V1 21 VERSION AEG SOLAR MODULES INSTALLATION MANUAL GLASS BACKSHEET STANDARD MODULE SERIES AS MXXX2 AS MXXX3 AS MXXX7 S AS MXXX8 AS PXXX8 AS MXXX9 AS PXXX9 ...

Страница 2: ...rtant information for product care maintenance and disposal 1 PRELIMINARY REMARKS 1 1 Icons This section describes relevant warning symbols recurring in the installation and operation manual of AEG solar modules Icons highlight relevant information for the physical and property safety of the user Compliance to the provided instructions is essential to prevent physical injury and product damage Bel...

Страница 3: ...ltage Maximum Series Fuse 340 0 5 41 70 10 40 34 01 10 01 1000 20 W W V A V A V A AS M1202 H G1 340 Figure 1 label example Serial Number Each individual module is identified by a unique serial number univocally coupled with a barcode Serial number and barcode are permanently placed on the laminate under the front glass of the module and are visible from the module front Connector Connector Groundi...

Страница 4: ...iring and support frames suitable for use in a solar electric installation Do not wear metallic rings watchbands ear nose or lip rings or other metallic devices while installing or troubleshooting photovoltaic systems in order to avoid electric shock Do not disconnect modules under load to avoid electrical arcs Contact with electrically active parts of the modules such as terminals can result in b...

Страница 5: ...ut of the modules in a photovoltaic system keep suitable access space to allow easy maintenance and inspection works Provide adequate ventilation under the modules for cooling Always use structures and materials specifically developed and certified for photovoltaic module installation AEG PV modules must be installed and stored in the following conditions Operating temperature From 40 C to 85 C Ex...

Страница 6: ...east 60 cm 24 inches For roof mounted systems always ensure the suitability of the roof construction before installing the modules on a roof In addition any point of roof penetration required to mount the modules must be properly sealed to prevent leaks Provide adequate ventilation under the modules in conformity to local regulations A minimum distance of 10 cm between the roof plane and the frame...

Страница 7: ...ive pressure of 5400 Pa and negative pressure of 2400 Pa Please note the indications in the below pictures L module length module long side W module width module short side X Y clamp installation point arrows bolting clamping points Mounting with bolts Module series AS Mxxx2 AS Mxxx9 AS Pxxx9 Module series AS Mxxx2 AS Mxxx8 AS Pxxx8 AS Mxxx9 AS Pxxx9 Load positive 2400Pa negative 2400 Pa Load posi...

Страница 8: ...scheme 3 3 Electrical Installation and Grounding 3 3 1 General remarks Modules electrically connected together in a series parallel configuration generate DC electrical energy which can be converted to AC by mean of a solar inverter When modules are connected in series the total voltage is equal to the sum of individual voltages For applications requiring high currents photovoltaic modules can be ...

Страница 9: ... maximum series fuse rating of the module and local electrical installation codes There is no specific limitation on the number of modules that can be connected in parallel the number of modules is determined by system design parameters such as current or power output To prevent the cables and the connectors from overheating the cross section of the cables and the capacity of the connectors must b...

Страница 10: ... electrical shock hazard Dirt and dust can accumulate on the glass surface of the PV module over time particularly in installations with low inclination This can cause a general decrease of power output and also sedimentation on the lower edge of the modules due to dirt accumulation We recommend a periodic cleaning of PV modules to ensure maximum power output especially in regions with high quanti...

Страница 11: ...nnected with such installation operation use or maintenance No responsibility is assumed by Solar Solutions GmbH for any infringement of patents or other rights of third parties which may result from use of the PV product No license is granted by implication or otherwise under any patent or patent rights 6 CONTACT Solar Solutions GmbH Brückenstrasse 94 60594 Frankfurt am Main Germany www aeg indus...

Отзывы: