4.3 Installation
The inverter has been designed to stand vertically. Because of the risk of faults oc-
curring to the cooling system, deviation from the vertical must not be more than
±15°. The device must not be installed in the horizontal position.
The mounting rail is supplied with the inverter.
Warning
Danger of personal injury. The inverter weighs 42 kg.
X
Always install the inverter using at least two people.
X
Use the handles on the inverter to carry the device.
When installing the inverter, choose a flat background which is not easily flamma-
ble, e.g. a concrete or stone wall.
You install the inverter as follows:
1 Use the supplied drilling template for drilling the holes.
If there are already inverters installed under the area to be drilled, please
cover the ventilation duct at the top. This is to prevent drilling dust entering
into the ventilation duct.
2 First fasten the mounting rail in horizontal position using 4 screws (ø 8 mm,
not supplied). Please use stainless-steel screws. Take the weight of the inverter
(42 kg) into account when selecting the fastening material.
3 Hang the inverter into the mounting rail from above.
Place the inverter as far up as possible and let it slide onto the mounting rail
from above.
The side and top flanges serve to guide the inverter.
4 Use screws to fasten the device at the bottom.
If further inverters are installed, a minimum distance of 15 cm must be main-
tained between the inverters.