11
EKI-7712G-4FMPI User Manual
5.
Secure the wall mount plates with M3 screws, see the following figure.
Figure 2.4 Installing Wall Mount Plates
Once the wall mounting plates are secure on the device, you will need to attach the
wall screws (x6).
6.
Locate the installation site and place the switch against the wall, making sure it
is the final installation location.
7.
Use the wall mount plates as a guide to mark the locations of the screw holes.
8.
Drill four holes over the four marked locations on the wall, keeping in mind that
the holes must accommodate wall sinks in addition to the screws.
9.
Insert the wall sinks into the walls.
10.
Insert the screws into the wall sinks. Leave a 2 mm gap between the wall and
the screw head to allow for wall mount plate insertion.
Figure 2.5 Securing Wall Mounting Screws
11.
Align the wall mount plate over the screws on the wall.
Note!
Make sure the screws dimensions are suitable for use with the wall
mounting plate.
Do not completely tighten the screws into the wall. A final adjust
-
ment may be needed before fully securing the wall mounting plates
on the wall.
4.5 mm
3.0 mm
2.0 mm
Содержание EKI-7712G-4FMPI
Страница 1: ...User Manual EKI 7712G 4FMPI 8GE 4G SFP Port Managed Redundant High PoE Industrial Switch ...
Страница 15: ...Chapter 1 1Product Overview ...
Страница 21: ...Chapter 2 2Switch Installation ...
Страница 36: ...Chapter 3 3Configuration Utility ...
Страница 42: ...Chapter 4 4Managing Switch ...
Страница 167: ...Chapter 5 5Troubleshooting ...