background image

 11

 

 

Important Sequencer Rules

 

3) 

Wait Time Step Offset

 

Sequencing Down to Up

—When running the sequencer from the 

DOWN 

State to the 

UP 

state wait times 

for the CURRENT step are applied .

 

Sequencing UP to DOWN

—When running the sequencer from an 

UP 

State to a 

DOWN 

state the wait 

times for the current step + 1 are applied.  

 

We hope you enjoy all the power available from the Advanced Radio Air Safe system.

 

If you have any feedback please feel free to contact us.

 

The Advanced Radio Engineering Team.

 

Step = DOWN

Gear is down and door 

are are closed

Step = 1

Gear is still down and 

doors transition to  

open

Wait Time  

1.0 Second 

for doors to open

Transmitter switch is 

switched to Gear 

UP position

Step = 2

Gear transitions to up 

position and doors 

remain open

Wait Time  

5.0 Seconds

for gear to transition

Step = UP

Gear is in UP position 

and Doors  transition 

to closed 

Wait Time  

1.0 Seconds

Gear

Doors

Gear

Doors

Gear

Doors

Gear

Doors

Wait Time  

0.0 Seconds

Gear Down To Up Sequence

Step wait times are normal

Transmitter switch is 

set to Gear DOWN 

position

Step = DOWN

Gear is down and door 

transition to closed

Step = 1

Gear transitions to 

down and doors 

remain  open

Wait Time  

1.0 Second 

for doors to close

Wait Time  

5.0 Seconds

for gear to transition

Step = 2

Doors transition to 

open position and gear 

remains up

Wait Time  

1.0 Second for doors to 

open

Step = UP

Gear and Doors are in 

UP position 

Wait Time  

0.0 Seconds

Gear

Doors

Gear

Doors

Gear

Doors

Gear

Doors

Step wait times are shifted

Gear Up To Down Sequence

Содержание Air Safe

Страница 1: ...Air Safe Failsafe Gear Sequencer User Guide ...

Страница 2: ... 3 Features 4 Air Safe Start up Screen 5 Run Mode Screen 7 Programming Main Menu Screen 8 Fail Safe Screen 6 Sequencer Screen 7 Sequencer Outputs 1 6 and Programming 7 8 Sequencer Step Programming 9 Air Safe with Smooth Flite 26 10 Important Sequencer Rules 10 11 Warranty 12 ...

Страница 3: ...reases a value Joystick PRESS Selects and item or new page Joystick PRESS on the word RETURN at the top of the screen will return you to a previous page WARNING Air Safe will power air valves servos for gear doors and linear actuated electric retracts i e retracts that connect with a servo lead It is not designed to directly power electric DC motor retracts MULTI CHANNEL USAGE Air Safe offers up t...

Страница 4: ...age range can be from 6volts to 8 4volts 6 channel sequencer with PWM outputs to run air valves servos or linear retracts Easy to see daylight OLED screen for setup and pressure monitoring 5 way joystick for easy programmability servo normal reverse on all channels end point setting on all channels Dual power inputs for larger setups ARXL protocol output to connect to any Advanced Radio ARXL devic...

Страница 5: ...M PRESSURE 150 0 PSI GEAR POSITION DOWN PROGRAMMING MODE To move to program ming mode press the joystick This will take you to the programming menu Programming Main Menu Screen On the Programming menu use the joystick DOWN Arrow and UP Arrow to move between the different menu items As you move between the different menu items the se lected item will be highlighted with a white background Select FA...

Страница 6: ...ure The FS 0 0 PSI will take on the value of the system pressure and the SET FAIL SAFE menu item will change to read CLEAR FAIL SAFE From this point forward if the system pressure SET FAIL SAFE RETURN FS 70 0 PSI LV 70 0 PSI CLEAR FAIL SAFE drops below the Fail Safe pressure a gear down event will be triggered You can clear the Fail Safe pressure highlighting CLEAR FAIL SAFE and pressing the joyst...

Страница 7: ...1 SEQUENCER SETUP SEQ OUTPUT 1 6 Joystick RIGHT Arrow Starts a Sequence to the up position Joystick LEFT Arrow Starts a sequence to the down position Joystick PRESS Stops the sequence at the current sequence step Hint The current sequencer position will be shown at the top right of the screen Please Note From the factory the sequencer is programmed with all outputs in the down position for all seq...

Страница 8: ...s 1 0 UP POS Highlight this menu item to alter the UP POSITION of an air valve or servo con trolled door DN POS Highlight this menu item to alter the DOWN POSITION of an air valve or servo controlled door NOTE It is important to have the air valve servo position correctly set before you pro gram the sequencer The sequencer assumes the Up and Down positions have been cor rectly set SEQ OUTPUT 1 SPE...

Страница 9: ...the selected output Hint To manually test the sequencer highlight the RETURN and press push down the joystick Then use the manual UP DOWN function to test the up and down function of the sequencer You can of course also use the transmitter to test the sequencer Please note The Air Safe Sequencer Arms From Gear Switch Down position Factory Default This means the gear switch must be moved to the dow...

Страница 10: ...e next step Example 1 a Slowest Servo Speed set to 5 b Wait To Next Step set to 2 0 seconds c Total step time approx 1 second 2 0 3 0 seconds Example 2 a All servos Speed set 0 0 b Wait To Next Step set to 2 0 seconds c Total step time 0 0 2 0 2 0 seconds In this example it will appear as if the step was missed Example 3 a All servos Speed set 0 0 b Wait To Next Step set to 0 0 seconds c Total ste...

Страница 11: ...itch is switched to Gear UP position Step 2 Gear transitions to up position and doors remain open Wait Time 5 0 Seconds for gear to transition Step UP Gear is in UP position and Doors transition to closed Wait Time 1 0 Seconds Gear Doors Gear Doors Gear Doors Gear Doors Wait Time 0 0 Seconds Gear Down To Up Sequence Step wait times are normal Transmitter switch is set to Gear DOWN position Step DO...

Страница 12: ...chieve a very high quality and reliable product Our QC process provides for complete system functionality testing followed by rigorous load and stress testing If the unit passes this stress test it is further run and heat soaked at 60 C for a period of 8 hours prior to final testing where it is load tested for a second time If it passes these tests it is then packaged We believe in our processes a...

Отзывы: