1
TSU NetVanta Router Module
(with ADTRAN OS Command Line Interface)
Quick Start Guide
61202350L1-13A
June 2003
Before you begin...
Tools Required
•
A VT100 terminal or a PC with VT100 emulator software for connecting to the unit.
Specifications
Interface Type:
10/100 BaseT (RJ-48)
Configuration:
Mapping and testing functions performed through TSU/ESU front panel.
All router configuration performed through the
CONTROL
interface using ADTRAN OS Command Line Interface.
Environmental Specifications:
Compliance:
Operating Temperature: 0°C to 45°C
FCC Part 15, Class A
Storage Temperature: -20°C to 70°C
UL 60950, 3rd Edition
Relative Humidity: Up to 95% non-condensing
EN 60950
ETSI 300 386
Network Diagrams
Point-to-Point T1 Diagram (Use Steps 1-4, 6-12 to configure the PPP example and 1-5, 7-12 to
configure the Frame Relay example.)
The configuration sections of this quick start guide are formatted to provide both step-by-step text
descriptions and screen shots containing a text script. The configuration scripts are available on the
TSU NetVanta Router Module Documentation CD.
When designing a point-to-point application, ensure that there is timing on the circuit (by setting one unit
to internal timing and one to network recovered timing). In addition, point-to-point frame relay
applications require one device configured for USER signaling and one for NETWORK signaling.
Branch Office
Corporate HQ
Gateway Router
LAN IP: 190.72.22.40/24
192.22.72.101/24
eth 0/1
LAN IP: 10.10.20.7/24
Router
Network IP: 10.10.20.0
Network IP: 190.72.22.0
SHIFT
*
7
D
4
A
1
8
0
E
5
B
2
QUICK
TSU IQ
#
9
F
6
C
3
ENTER
CANCEL
NEXT
PREV
ADD
DELETE
TSU
SHIFT
*
7
D
4
A
1
8
0
E
5
B
2
QUICK
TSU IQ
#
9
F
6
C
3
ENTER
CANCEL
NEXT
PREV
ADD
DELETE
TSU
V.35
Point-to-Point T1
FR 1
DLCI 16
Annex D Signaling
192.22.72.1/24
PPP1
PPP Signaling
RIP V2
192.22.72.1/24
or