background image

3

61291004L2-5, Issue 2

61291004L2-5B

Compliance Codes

This product is intended for installation in a restricted
access location in a Type B or E enclosure only.  In
normal operation, loop current will not exceed 22 mA
@ -130 Vdc with a maximum power requirement of
100 mA from -48 Vdc.  See 

Table 1

 for codes.

Signal Pinout

The ADTRAN TRDDB plugs directly into a WECO
or equivalent D4 channel bank or the ADTRAN ACT
1900/2300 channel bank.  No special wiring is
required.  The 2-wire loop is connected using the Tip
(pin 24) and the Ring (pin 51) on the D4 backplane.
The 4-wire DS0 signal uses MA (pin 46) and MB (pin
48) as the DS0 input pair and EA (pin 45) and EB (pin
19) as the DS0 output pair. Refer to 

Figure 5

 for

pinout assignments.

Code

Input

Output

Power Code (PC)

F

C

Telecommunication Code (TC)

X

Installation Code (IC)

A

Table 1.  Compliance Codes

Figure 5.  Connector Pin Assignments

Figure 4.  Back-Hauled IXC T1 to DDS

DS0

DS0

IXC

T1

DS0

DP

TR

OCU-R

DSU/

CSU

GPC, D4,

or

SLC96

TR

DDB

Test

Head

2-wire

Loop

50 kft

Customer Premises

CO

Figure 3.  Multipoint DDS Deployment

DS0

DS0

DS0

DS0

DS0

IXC

T1

DS0

DP

MJU

TR

OCU-R

TR

DDB

DSU/

CSU

GPC, D4, or SLC96

2-wire

Loop

50 kft

TR

OCU-R

TR

DDB

DSU/

CSU

2-wire

Loop

50 kft

TR

OCU-R

TR

DDB

DSU/

CSU

2-wire

Loop

50 kft

TR

OCU-R

TR

DDB

DSU/

CSU

2-wire

Loop

50 kft

Customer Premises

CO

MA, MB:  DS0 Input Pair
EA, EB:  DS0 Output Pair
T, R:  Customer Loop

1

28

2

29

3

30

4

31

5

32

6

33

7

34

8

35

9

36

10

37

11

38

12

39

13

40

14

41

15

42

16

43

17

44

18

45

19

46

20

47

21

48

22

49

23

50

24

51

25

52

26

53

27

54

FRM GND

GND

GND

-48R

EB (SC)

T

IN CLK

+5V

-48V

(E) EA

(M) MA

(SB) MB

R

Содержание Total Reach TRDDB

Страница 1: ...NSTALLATION 2 3 TESTING 5 4 REMOTE PROVISIONING AND DIAGNOSTICS 7 5 DEPLOYMENT GUIDELINES 8 6 MAINTENANCE 9 7 WARRANTY AND CUSTOMER SERVICE 9 FIGURES Figure 1 Total Reach DDB 1 Figure 2 DS0 Level Test Access for DDS Customers w 2 End Points Served from Same CO 2 Figure 3 Multipoint DDS Deployment 3 Figure 4 Back Hauled IXC T1 to DDS 3 Figure 5 Connector Pin Assignments 3 Figure 6 Rate Selection an...

Страница 2: ...ons NEAR and FAR logic level Bantam test access Loop Quality Monitor and latching loopback Description The ADTRAN D4 TRDDB is a 2 wire Total Reach DDS functional replacement for the following ADTRAN 4 wire OCU part numbers 1104004L3 D4OCBRD2AA 1104004L4 D4OCBRE2AA 1105004L1 D4OCBSD2AA 1105004L2 D4OCBSE2AA 1105018L1 D4OCBTD2AA The TRDDB delivers data at rates up to 64 kbps using a single copper pai...

Страница 3: ... Figure 5 for pinout assignments Code Input Output Power Code PC F C Telecommunication Code TC X Installation Code IC A Table 1 Compliance Codes Figure 5 Connector Pin Assignments Figure 4 Back Hauled IXC T1 to DDS DS0 DS0 IXC T1 DS0 DP TR OCU R DSU CSU GPC D4 or SLC96 TR DDB Test Head 2 wire Loop 50 kft Customer Premises CO Figure 3 Multipoint DDS Deployment DS0 DS0 DS0 DS0 DS0 IXC T1 DS0 DP MJU ...

Страница 4: ...DTRAN s Protected Loopback mode Protected Loopback ADTRAN s Protected Loopback supports the DDS latching loopback standard in T1E1 2 99 007R1 When enabled the TRDDB will respond to latching loopback when the idle code preamble is sent prior to the latching loopback sequence specified in TR62310 and ANSI T1 417 See Table 3 for the latching loopback sequence requirement when Protected Loopback is en...

Страница 5: ... 1 C I P e g u a G 2 2 2 1 9 0 8 5 2 0 1 5 1 0 1 1 F 0 P L U P e g u a G 2 2 F 0 7 P L U P e g u a G 2 2 F 0 2 1 P L U P e g u a G 2 2 4 5 4 9 0 6 0 6 0 1 0 7 3 1 1 F 0 C I P e g u a G 4 2 F 0 7 C I P e g u a G 4 2 F 0 2 1 C I P e g u a G 4 2 1 7 5 2 1 2 8 9 3 1 7 1 9 4 1 F 0 P L U P e g u a G 4 2 F 0 7 P L U P e g u a G 4 2 F 0 2 1 P L U P e g u a G 4 2 0 0 9 2 1 4 2 3 4 1 8 6 2 5 1 F 0 C I P e g...

Страница 6: ... t y B d e v i e c e R s e t y B d e v i e c e R s e t y B d e v i e c e R s e t y B d e v i e c e R s e t y B d e v i e c e R g n i t s i x e r a e l C s k c a b p o o l e c i v e d y f i t n e d I d e p o o l e b o t p o o l o t e r a p e r P e d o c P A M d n e s s e t y b 0 3 r e t f a e t a v i t c A k c a b p o o l n i n o i t i s n a r T P I T s s e r g o r p 0 1 0 1 1 1 0 X t c e l e s k c...

Страница 7: ...al Reach system latching loopbacks whether initiated by the craft interface LBK pushbutton or via the Test Center or CO may be disabled by sending 35 TIP bytes X0111010 where X is a don t care All existing latching loopbacks may also be disabled by pressing the LBK pushbutton on the CO or remote units 4 REMOTE PROVISIONING AND DIAGNOSTICS Control Protocol Remote access to provisioning and status i...

Страница 8: ...rmation stored in 15 minute and 24 hour registers for both the TRDDB and TROCU R and an event log which time stamps system performance anomalies and threshold violations Physical access to the terminal interface on the TROCU R is made by a serial interface connection to a dumb terminal or dumb terminal emulation Provisioning of the TRDDB can be viewed and changed from the terminal interface on the...

Страница 9: ...cy and Procedure document 60000087 10A Contact Customer and Product Service CAPS prior to returning equipment to ADTRAN For service CAPS requests or further information contact one of the following numbers ADTRAN Sales Pricing Availability 800 827 0807 ADTRAN Technical Support Presales Applications Postsales Technical Assistance 888 726 8663 Standard hours Monday Friday 7 a m 7 p m CST Emergency h...

Страница 10: ...10 61291004L2 5 Issue 2 61291004L2 5B ...

Отзывы: