Appendix A. Loop Status Messages
A-2
Express 4100/4110 User Manual
61200176L2-1
DISCONNECTING
A call is in the process of being disconnected.
DMS-100 Ready
The ISDN link layers 1 through 3 are up against a Nortel DMS-100 switch
and is ready for calls.
Echo: Tx: X Rx: Y
The current transmit and receive count for the PPP echo request test.
Getting TEI #1
The Express 4100/4110’s ISDN layer 1 is up and is now getting the first
TEI from the ISDN network.
Getting TEI #2
The Express 4100/4110’s ISDN layer 1 is up and one TEI is obtained. It is
now getting the second TEI from the ISDN network.
ISDN-1 Ready
The ISDN link layers 1 through 3 are up against a switch running the
ISDN-1 protocol and is ready for calls.
Layer 1 up
The Express 4100/4110’s ISDN layer 1 is up.
Link down
The ISDN link is not synchronized.
Link In Sync
The ISDN link is synchronized but layer 1 is not up.
LUCENT-5ESS Ready
The ISDN link layers 1 through 3 are up against an LUCENT 5E switch
and is ready for calls.
NET EOC LOOPBACK
Express 4100/4110 has received an ISDN EOC loopback command from
the switch.
Содержание Express 4100
Страница 10: ......
Страница 22: ...List of Figures xii Express L100 L100T User Manual 61200176L2 1...
Страница 24: ...List of Tables xiv Express L100 L100T User Manual 61200176L2 1...
Страница 30: ...Quick Startup Guide Quick Start 6 Express 4100 4110 User Manual 61200176L2 1...
Страница 50: ...Chapter 2 Installation 2 6 Express 4100 4110 User Manual 61200176L2 1...
Страница 140: ...Chapter 5 Specifications 5 4 Express 4100 4110 User Manual 61200176L2 1...
Страница 166: ...Appendix B Log Messages B 22 Express 4100 4110 User Manual 61200176L2 1...
Страница 170: ...Appendix C SNMP C 4 Express 4100 4110 User Manual 61200176L2 1...
Страница 190: ...Appendix F Frame Relay Firmware Version F 14 Express 4100 4110 User Manual 61200176L2 1...
Страница 202: ...Acronyms Acronyms 4 Express 4100 4110 User Manual 61200176L2 1...