Installation
61287722G1-5B
13
Required Tools
Standard
technician
tools
are
used
for
a
SBU
ONT
installation
(for
example,
drill,
drill
bits,
side
cutters,
screwdrivers,
nut
drivers,
hex
wrenches,
wire
strippers,
etc.).
Specifically,
the
following
tools
are
required
for
the
installation
of
the
SBU
ONT:
• Carpenter’s
level
• 3/32”
screw
driver
• 5/32”
hex
tamper
‐
proof
bit
• 216
‐
Type
can
wrench
• Fiber
splicing
tools
• Eight
(8)
RJ
‐
11
connectors
for
POTS
testing
(used
in
conjunction
with
each
Pivot
connection)
• Two
(2)
RJ
‐
45
connectors
for
Ethernet
connections
• Four
(4)
RJ
‐
45
connectors
for
DS1
connections
• A
telephony/data
communication
test
set
• Power
meter
preferably
with
wave
length
filtering
• Fiberscope
or
videoscope
• Optical
Time
Domain
Reflector
meter
calibrated
for
1310
and
1490
nm
output
• Composite
fiber
cable
for
non
‐
connectorized
installation
• SBU
ONT
mounting
hardware
• Silicone
sealant
(and
application
material,
i.e.,
cotton
swabs)
• Bonding
clamp
for
grounding
and
securing
the
composite
cable
on
non
‐
connectorized
installations
• One
(1)
each,
60”
Hi
‐
cap
riser
pipe
(for
composite
cable
installation)
• Tie
wraps
• TexWipe
TM
Alco
pad
for
fiber
cleaning
• TexWipe
TM
cloth
for
fiber
cleaning
Included
with
the
SBU
ONT
packaging
are
fiber
cable
management,
strain
relief
and
fiber
connectors.
POTS
connections
are
made
using
pivot
connectors.
Necessary Supplies
Make
sure
the
following
supplies
are
available:
• Appropriate
surface
anchors
for
mounting
the
SBU
ONT
[each
anchor
rated
to
18
lbs
(8.2
kg)
minimum]
• Assorted
tie
wraps
for
securing
cabling
and
wiring
Содержание 1287722G1
Страница 6: ...Total Access 372 Small Business Unit ONT Installation and Maintenance Guide vi 61287722G1 5B ...
Страница 10: ...Total Access 372 Small Business Unit ONT Installation and Maintenance Guide x 61287722G1 5B ...
Страница 12: ...Total Access 372 Small Business Unit ONT Installation and Maintenance Guide xi 61287722G1 5B ...