Installation
61187715G1-5B
17
Instructions for Installing the SFU ONT
A
typical
ONT
installation
with
UPS
is
shown
in
Figure 6. Typical ONT Installation
Installations
may
vary
from
this
diagram
depending
on
the
manner
in
which
the
Customer
Premises
Equipment
(CPE)
wiring
is
installed,
the
location
of
the
AC
outlet
used
to
power
the
ONT
local
power
supply,
whether
or
not
a
communications
distribution
panel
was
provided,
and
the
proximity
of
the
external
ends
of
the
CPE
wiring
to
the
subscriber’s
electrical
service
point.
Communications
Distribution
Panel
Customer provided premises
wiring including CAT5 or
higher Ethernet cable and
POTS twisted pair to be
terminated in the ONT by
technician
UPS with battery backup
installed by technician
GFI/non-GFI outlet - highly
recommend non-GFI outlet
PVC conduit supplied by subscriber
with pull string for UPS low voltage
wiring installed by technician
6 AWG ground wire
installed from the ONT
to the established MGN
Riser conduit for
fiber drop cable