Getting Started
35
RQX-58x Series
Mounting the Device / Montage de l'Appareil
Mount the device to a wall using the 4 keyhole openings indicated
or the 6 mounting holes circled in red, according to the spacing
dimensions of the holes in the bracket as shown in Figure 2-2
RQX-58x Series Top View.
Montez l'appareil sur un mur à l'aide des 4 ouvertures de trou de
serrure en fonction des dimensions d'espacement des trous dans
le support, comme indiqué dans Figure 2-2 RQX-58x Series Top
View.
keyhole
openings
Содержание ROScube-X RQX-58 Series
Страница 6: ...vi Table of Contents Leading EDGE COMPUTING Consignes de S curit Importante 41 Getting Service 45...
Страница 8: ...viii List of Tables Leading EDGE COMPUTING This page intentionally left blank...
Страница 10: ...x List of Figures Leading EDGE COMPUTING This page intentionally left blank...
Страница 19: ...Specifications 9 RQX 58x Series Figure 2 3 RQX 58x Series E Top View 208 90 322...
Страница 20: ...10 Specifications Leading EDGE COMPUTING Figure 2 4 RQX 580 Front and Rear View 190 80 35 25...
Страница 21: ...Specifications 11 RQX 58x Series Figure 2 5 RQX 58G Front and Rear View 190 80 83 96 88 20 20...
Страница 22: ...12 Specifications Leading EDGE COMPUTING Figure 2 6 RQX 580 E Front and Rear View 80 20 20 137 97...
Страница 23: ...Specifications 13 RQX 58x Series Figure 2 7 RQX 58G E Front and Rear View 80 20 20 137 97...
Страница 24: ...14 Specifications Leading EDGE COMPUTING Figure 2 8 RQX 58x Series Side View...
Страница 25: ...Specifications 15 RQX 58x Series Figure 2 9 RQX 58x Series Bottom View 219 20...
Страница 26: ...16 Specifications Leading EDGE COMPUTING This page intentionally left blank...
Страница 46: ...36 Getting Started Leading EDGE COMPUTING This page intentionally left blank...
Страница 48: ...38 Power Leading EDGE COMPUTING This page intentionally left blank...
Страница 54: ...44 Consignes de S curit Importante Leading EDGE COMPUTING This page intentionally left blank...