System Requirements
5
CM5-P1000
3
System Requirements
3.1
Power Sequencing
For initial power on, or to Resume from S3 and S4, this sequence
must be followed.
Figure 3-1: Power Sequencing
3.2
Module Power Up and Down
Issuing the PWR_EN signal powers the CM5-P1000 module
down, and the system designer can decide whether to keep the
module input power when the CM5-P1000 module is powered
down.
T
PV-PE
PV
T
PE-PG
PV
T
PV-PE
T
PE-PG
Содержание CM5-P1000
Страница 6: ...vi Table of Contents Important Safety Instructions 9 Getting Service 13...
Страница 8: ...viii List of Tables This page intentionally left blank...
Страница 10: ...x List of Figures This page intentionally left blank...
Страница 22: ...2 Interfaces Figure 2 2 CM5 P1000 Bottom Side Layout DP 2 DP 4 DP 1 DP 3 PCIe 104 Connector External DC Input...
Страница 32: ...12 Important Safety Instructions This page intentionally left blank...