![Adisa ADI LT 105 Скачать руководство пользователя страница 31](http://html.mh-extra.com/html/adisa/adi-lt-105/adi-lt-105_technical-manual-installation-maintenance_2851532031.webp)
ADI LT boiler – Technical manual
Page
31
15. INSTALLATION
15.1 BOILERS HEAT OUTPUT
The boilers total power output to be installed must be the proper one to respond to the demands of the
installation. In order to generate heating with the maximum efficiency at every moment, it is important to
consider the number of the boilers to be installed, so that the total power should be appropriate for the different
demands of the installation in the different periods of the year.
15.2 LIFITNG AND TRANSPORTING THE BOILERS BY A CRANE
15.2.1 Models ADI LT 250 and higher:
a) In order to lift the boilers by a crane, attach the straps to the boiler hooks: there are 2 in the front and 1 in the
back of the boiler heat exchanger. Before realizing this operation, you have to dismantle / take out all the
casing panels of the boiler.
b) They are provided with some sections on the
base to ease their transport by transpallet.
c) Anti-vibrating
supports
(silent-blocks)
are
supplied with each boiler.
15.2.2 Models ADI LT 200 and lower:
Supply in pallets. Anti-vibrating supports (silent-blocks) are supplied with each boiler.
15.3 BOILERS ROOM
The boilers room must be clean, well vented and lightened, and must comply with the current regulations for gas
equipments. It is important to avoid environments with excess of humidity, dust and aggressive steams. If the
boilers room needs to have some building works, the boilers should be switched off and protected in order to
avoid dust.
For an easier maintenance it is important to respect the minimum distances indicated by the regulations and the
manufacturer’s instructions, both for one boiler and for several boilers. Every part of the boiler must be easily
accessible.
Installation of several boilers (modular assembly): being the boilers maintenance realized from the front and
the back, several boilers can be installed leaving a minimum distance of 10 cm between them.
MINIMUM FREE HEIGHT TO REMOVE THE BURNER:
In order to remove the burner, leave a free space between the top of the boiler and the ceiling.
Model
LT 105
LT 130
LT 150
LT 200
LT 250
LT 275
LT 325
LT 400
LT 475
LT 550
LT 650
LT 750
Minimum nett free
space from the top
of the boiler
250
500
500
500
97
97
97
167
167
282
282
282
Free height from the
leaing point of the
boiler on the floor
1375 1625
1625
1625
1705
1705
1705
1775
1775
1975
1975
1975
Boiler draining: Connect the boiler draining to the
boilers room drainage.
In order to drain water from the boiler, turn off the boiler,
close the cut-off valves and open the boiler draining.
Beside the boiler draining, there is a connection with a
threaded bar that has to be unscrewed and taken out in
order to allow the draining of the water from the boiler.
Содержание ADI LT 105
Страница 1: ...5 2010 ADI LT BOILER LOW TEMPERATURE TECHNICAL MANUAL OF INSTALLATION USE AND MAINTENANCE ...
Страница 7: ...ADI LT boiler Technical manual Page 7 Models ADI LT 250 and higher A C D B J Q H G F E R S N L M P ...
Страница 28: ...ADI LT boiler Technical manual Page 28 ELECTRIC DRAWING ADI LT 250 325 ...
Страница 29: ...ADI LT boiler Technical manual Page 29 ELECTRIC DRAWING ADI LT 400 750 ...
Страница 57: ......