Adey CP1-03-04913 Скачать руководство пользователя страница 16

30 

-

-

 31

 -

12  PRODUCT LOG

12 .11 

Customer details

Customer/company name

Site address

Date

12 .12 

Equipment details

System volume m

3

Expansion vessel(s) fitted & pre-

charge pressure
Boiler(s) fitted

12 .13 

Commissioning record

 

Date commissioned
Company
Engineer
System set pressure
Differential pressure
Hi alarm set pressure
Lo alarm set pressure

1

2 .14 

Service Log

Service No. 1

Date
Engineer name
Company name
Tel . No
System pressure bar
Differential pressure bar

Check

6 months

12 months

Condition of wiring

ü

ü

Condition of hoses

ü

ü

Evidence of leakage

ü

ü

Controller fault codes

ü

ü

Test pump operation

ü

ü

Float valve operation

x

ü

Level probe operation

x

ü

Water condition

x

ü

Exp . vessel pre-charge

x

ü

Comments

Service No. 2

Date
Engineer name
Company name
Tel . No
System pressure bar
Differential pressure bar

Check

6 months

12 months

Condition of wiring

ü

ü

Condition of hoses

ü

ü

Evidence of leakage

ü

ü

Controller fault codes

ü

ü

Test pump operation

ü

ü

Float valve operation

x

ü

Level probe operation

x

ü

Water condition

x

ü

Exp . vessel pre-charge

x

ü

Comments

Service No. 3

Date
Engineer name
Company name
Tel . No
System pressure bar
Differential pressure bar

Check

6 months

12 months

Condition of wiring

ü

ü

Condition of hoses

ü

ü

Evidence of leakage

ü

ü

Controller fault codes

ü

ü

Test pump operation

ü

ü

Float valve operation

x

ü

Level probe operation

x

ü

Water condition

x

ü

Exp . vessel pre-charge

x

ü

Comments

Содержание CP1-03-04913

Страница 1: ...Installation and servicing Midi 135 150 235 250 Digital Pressurisation Unit...

Страница 2: ...rated with the front cover in place z In the interests of electrical safety a 30 mA residual current device R C D not supplied should be installed in the supply circuit This may be part of a consumer...

Страница 3: ...l cause leakage 1 16 Secure pipework Ensure pipework to and from pump is independently supported clipped to prevent forces being transferred to inlet and outlet branches of the unit Do not secure pipe...

Страница 4: ...ny spillage is contained or routed to avoid electrics or areas sensitive to water damage As part of the AB airgap CAT 5 fluid isolation the APU has a weir type overflow on the right hand side water wi...

Страница 5: ...nit on either the left or right The pumps are connected to the tank via a rubber connector A pressure transducer monitors system pressure and if a reduction in system pressure is detected the controll...

Страница 6: ...which the APU Midi is located is flat and level 3 If possible locate the unit against a wall for added stability 4 If the APU Midi is located in an area that might be subjected to flooding mount the A...

Страница 7: ...dance with the current national electrical regulations and installed by a qualified person 5 12 Safety In the interests of electrical safety a 30 mA residual current device R C D not supplied should b...

Страница 8: ...for boiler chiller shut down in the event that the APU Midi detects system pressure above the Hi alarm pressure or below the Lo alarm pressure The boiler interlock contact will be open circuit below t...

Страница 9: ...to function correctly the following conditions must be met If these conditions have not been met the commissioning process should not continue z Ensure the system connection has been made into the hea...

Страница 10: ...ctivity Pump run time Alarm reset 6 18 Setting menu Pass code protected if set The following functions can be set and modified System pressure 2 see Fig 20 Sets the required system pressure Set in 0 1...

Страница 11: ...able from 3 to 120 seconds pre set to 3 seconds Increasing this time will reduce un wanted APU Midi operation during rapid system pressure fluctuations circulator pump starts Pump test Forces pump 1 L...

Страница 12: ...pressure error and the red error light will illuminate on the front of the APU this is normal z Open the isolation valve on the outlet of the APU and the APU will run and start to fill the system 6 2...

Страница 13: ...on the screen may be shown slightly higher than the set pressure whilst the pump is running As soon as the pump stops this displayed reading will settle back to the actual system pressure During the n...

Страница 14: ...ng order after a prolonged period of maintainance the following steps should be taken 1 Inspect the APU for signs of damage 2 Check APU tank for debris remove debris and clean tank if needed Debris ma...

Страница 15: ...em Activate system fill option to suppress alarm for 24 hours Leak in system Check system for leakage Monitor using system fill volume log reset if needed Increase pump run time limit Activity high al...

Страница 16: ...pump operation Float valve operation x Level probe operation x Water condition x Exp vessel pre charge x Comments Service No 2 Date Engineer name Company name Tel No System pressure bar Differential...

Страница 17: ...Office Gloucester Road Cheltenham GL51 8NR United Kingdom Object of the declaration Pressurisation Unit The object of the declaration described above is in conformity with the relevant Union harmonisa...

Страница 18: ...34...

Страница 19: ...com www adey com Produced from recycled material A carbon neutral company All ADEY marks are trademarks of Adey Holdings 2008 Limited Please visit adey com trademarks for a list of ADEY marks Copyrigh...

Отзывы: