
Adept Lynx Platform User's Guide, Rev D
Page 35 of 126
Chapter 2: Setup
1. Tip the docking station onto its back, so you can access the underside.
2. Remove the two lowest screws (M4 x 12 flat-head), if present.
In the following figure, these screws are circled. The location of the third screw hole is
also circled.
3. Attach the floor plate to the base of the docking station with three M4 x 12 flat-head
stainless steel screws.
The floor plate comes with three screws, so you will have two spares.
The docking station and floor plate do not need to be attached to the floor, as the weight of the
AIV on the floor plate will keep the docking station from moving.
Figure 2-10. Underside of Docking Station Foot, Showing Screw Locations
NOTE
: These are the three locations for the M4 x 12 flat-head screws. Two are
already in place, and need to be removed before attaching the plate.
Содержание Lynx Platform
Страница 1: ...Adept Lynx Platform User s Guide...
Страница 2: ......
Страница 38: ......
Страница 50: ......
Страница 62: ...Adept Lynx Platform User s Guide Rev D Page 62 of 126 Chapter 5 Connectivity Figure 5 7 E Stop Chain Diagram...
Страница 88: ......
Страница 115: ...Adept Lynx Platform User s Guide Rev D Page 115 of 126 Chapter 8 Maintenance Figure 8 18 Safety Scanning Laser...
Страница 125: ......
Страница 126: ...P N 11970 000 Rev D 5960 Inglewood Drive Pleasanton CA 94588 925 245 3400...