1. Attention
1. 1
Inspection And Acceptance
Please check carefully when open the package and make sure no parts
are rmss1ng.
1. 2 Safety
Please read the operation manual carefully before the installation and
adjustment of the machine. When finish the installation, check all the de-
tails and trial run the machine idlly before put it into operation.
tion.
1.
3 Caution
Keep in mind the safety measures for electrical and operating protec-
2. Work Environment
2. 1 The elevation of workshop has to be 2000m or less.
2. 2 No conductive dust allowed.
2. 3 No explosive factor allowed.
2. 4 No corrosive gas or steam which may corrode metal or damage the
insulation.
2. 5 Keep away from the source of impact or vibration.
-3-
Содержание ZX6350G
Страница 1: ...DRILLING MILLING MACHINE OPERATION MANUAL ...
Страница 13: ... 8 l f 00 1520 No 1 Rolling bearing position VI a D r 12 ...
Страница 19: ......
Страница 22: ...C Gear head 46 0 0 1 4 ctn 3 1 0 0 0 32 29 8 59 0 21 q _60 1 61 64 49 63 ...
Страница 23: ...D Ho rizontal spindle 52 22 77 ...
Страница 24: ... 11 J _ 10 9 8 12 I 13 r 1s 19 54 J Q 53 7 t3 6 0 E Gear box 21 20 23 ...
Страница 25: ...F Changing speed part 21 19 24 ...
Страница 30: ...NO NAME QUTY 61 SPRING I 62 SCREW 63 OIL POSITION 64 BOLT 29 ...
Страница 35: ......
Страница 37: ......
Страница 39: ......
Страница 40: ......
Страница 45: ......