
6
0$;,080&$3$&,7<'U\:HLJKW
OEV
NJ
%$6.(7',$0(7(5
FP
%$6.(7'(37+
FP
02725+RUVHSRZHU
+3
NZ
'22523(1,1*'LDPHWHU
FP
%$6.(792/80(
FXIW
FXP
'5<(563(5&217$,1(5
'5<(563(5758&.
92/7$*($9$,/$%/(
Y+]
$3352;:(,*+78QFUDWHG
OEV
NJ
$3352;:(,*+7&UDWHG
OEV
NJ
+($7,1387
EWXK
NFDOKU
$,5)/2:
FIP
FPP
,1/(73,3(&211(&7,21
)37
29(16,=(
.:
%78+
+]
.&$/+5
+]
$33/,('92/7$*(3+$6(
.:
92/7$*($9$,/$%/(
Y+]
$3352;:(,*+78QFUDWHG
OEV
NJ
$3352;:(,*+7&UDWHG
OEV
NJ
$,5)/2:
FIP
FPP
&2035(66('$,592/80(
FIK
FPK
$,5&211(&7,21
)37
67($0&2168037,21
%2,/(5+3
1250$//2$'
OEVKU
NJKU
23(5$7,1*67($035(6685(
6833/<
&211(&7,21
5(7851
&211(&7,21
SVLPD[
EDU
SECTION II
SPECIFICATIONS/COMPONENT IDENTIFICATION
A. SPECIFICATIONS
* For non-reversing models.
** A minimum of 3/4" pipe
must be
supplied to the gas inlet for each dryer.
*** Contact factory for electrical information not listed. 3-Phase figures shown are for 3-wire service.
**** Steam unit must be supplied with clean, dry, regulated air at 80 psi (+/- 10 psi).
***** Size of piping to dryer varies with installation conditions. Contact factory for assistance.
Shaded areas are stated in metric equivalents.
NOTE
:
ADC
RESERVES THE RIGHT TO MAKE CHANGES IN SPECIFICATIONS AT
ANY TIME, WITHOUT NOTICE or OBLIGATION.
Gas
Electric
Steam****
APPROXIMA
TE AMP
DRA
W